The permit approval is explicitly conditioned on adherence to spacing order 34126. The stipulations clarify the basis for setbacks and require pre-construction notification to the NDIC field inspector. Coordinates at key points are defined based on azimuth.
๐ข๏ธ DIMOND 160-91-36-24H-4
HUNT OIL COMPANY ยท Burke County, ND ยท File #42856 ยท Generated 2026-05-26 02:39
- API
- 3301302026
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
๐ Permit Cycle Assessment
The permit approval is explicitly conditioned on adherence to spacing order 34126. The stipulations clarify the basis for setbacks and require pre-construction notification to the NDIC field inspector. Coordinates at key points are defined based on azimuth.
๐ Permit Cycle Signals (4)
๐ Permit Information, Stipulations
๐
Unknown (Missing confidence)
Approval is explicitly tied to compliance with spacing order.
๐ Permit Information, Stipulations
๐
Unknown (Missing confidence)
Justifies the setback stipulation based on cementing and frac strategy.
๐ Permit Information, Stipulations
๐
Unknown (Missing confidence)
Requires pre-construction contact with NDIC field inspector.
๐ Permit Information, Stipulations
๐
Unknown (Missing confidence)
Specific coordinates are provided based on the lateral's azimuth, potentially impacting future adjustments.
๐ Historical Context (2)
All cores, core chips and samples must be submitted to the State Geologist as provided for under North Dakota Century Code: Section 38-08-04 and North Dakota Administrative Code: Section 43-02-03-38.1.
๐ RE: CORES AND SAMPLES ยท ๐
2026-04-27
Ongoing obligation to submit cores and samples per NDCC and NDAC.
Effective June 1, 2014, a container must be maintained on each well drilled in North Dakota beginning when the well is spud and must remain on-site during clean-out, completion, and flow-back wheneverfiltration operations are conducted.
๐ RE: Filter Socks and Other Filter Media ยท ๐
2025-05-30
Requirements for filter sock containers is an ongoing obligation.
Confidence: High
Key stipulations directly address permit conditions and spacing. Sampling requirements are clearly defined.