The permit approval is explained by Commission Order No. 35417, with specific stipulations regarding wellbore location, setbacks, and communication with the NDIC field inspector. The wet shoe completion design supports the southern setback rationale. Azimuth-specific legal coordinates define the wel
🛢️ ROOSEVELT FEDERAL 5003
WHITING OIL AND GAS CORPORATION · McKenzie County, ND · File #42886 · Generated 2026-05-26 02:39
- API
- 3305310798
- Target Formation
- Bakken
- Permit Explained
- Yes
📋 Permit Cycle Assessment
The permit approval is explained by Commission Order No. 35417, with specific stipulations regarding wellbore location, setbacks, and communication with the NDIC field inspector. The wet shoe completion design supports the southern setback rationale. Azimuth-specific legal coordinates define the well path.
🔍 Permit Cycle Signals (5)
📄 Permit Information
📅 Unknown (Missing confidence)
Explicitly references the order that grants drilling approval.
📄 Stipulations
📅 Unknown (Missing confidence)
Imposes specific drilling corridor and setback restrictions tied to the well's location and spacing unit.
📄 Stipulations
📅 Unknown (Missing confidence)
Justifies the southern setback based on the wet shoe configuration and frac-out potential.
📄 Page: 2 of 10
📅 2026-04-30 (Exact confidence)
Specifies the legal coordinates at the casing point and total depth based on the proposed lateral azimuth.
📄 Stipulations
📅 Unknown (Missing confidence)
Requires contact with the NDIC field inspector before starting location construction.
📖 Historical Context (4)
Remote or automatic shutoff devices are required on all equipment
📄 Stipulations · 📅 Unknown
This is a standing requirement for equipment on location.
A CBL must be run on the 9-5/8" Dakota string prior to running 7" casing.
📄 Stipulations · 📅 Unknown
This is a specific cementing verification requirement during drilling.
Operators shall not commence operations on a drill site until the 3rd business day following publication of the approved drilling permit on the NDIC - OGD Daily Activity Report. If circumstances require operations to commence before the 3rd business day following publication on the Daily Activity Report, the waiting period may be waived by the Director.
📄 Page: 2 of 10 · 📅 2026-04-30
Establishes a waiting period before commencing drilling, unless waived by the Director.
Effective June 1, 2014, a covered leak-proof container (with placard) for filter sock disposal must be maintained on the well site beginning when the well is spud and must remain on-site during clean-out, completion, and flow-back whenever filtration operations are conducted?
📄 Page: 7 of 10 · 📅 Unknown
Filter sock disposal requirements persist during operations.
Confidence: High
The permit explicitly references the order granting approval. Specific stipulations and conditions are clearly stated.