← Back to Daily Permits
OTHER
Permit approval is directly conditioned on compliance with Order 35053 spacing requirements, wet shoe configuration for the south setback, and specialized casing evaluation procedures.
🛢️ TUNNOCK 5303 12-2 2BX
OASIS PETROLEUM NORTH AMERICA LLC · Williams County, ND · File #42902 · Generated 2026-05-26 02:39
- API
- 3310506826
- Target Formation
- Bakken
- Permit Explained
- Yes
📋 Permit Cycle Assessment
Permit approval is directly conditioned on compliance with Order 35053 spacing requirements, wet shoe configuration for the south setback, and specialized casing evaluation procedures.
🔍 Permit Cycle Signals (3)
📄 Stipulations section
📅 2026-05-05 (Exact confidence)
Direct regulatory condition tied to permit approval.
📄 Stipulations section
📅 2026-05-05 (Exact confidence)
Technical justification for non-standard setback.
📄 Page 2 of 10
📅 2026-05-05 (Exact confidence)
Specific cement evaluation requirement differentiating this permit.
📖 Historical Context (2)
Drill-back notification obligation per Order No. 31848 for wells traversing adjacent spacing units.
📄 Affidavit dated 2026-02-11 · 📅 2026-02-11
Creates ongoing communication requirements with offset operators for future drilling.
Anti-collision protocols with 1.2 separation safety factor in intermediate sections.
📄 Anti-collision Statement · 📅 2026-01-12
Establishes persistent drilling safety standards for future well operations.
Confidence: High
All signals are extracted from regulator-issued stipulations or operator-submitted technical justifications explicitly referenced in the permit.