OTHER
Permit approval is directly conditioned on compliance with Order 35053 spacing requirements, wet shoe configuration for the south setback, and specialized casing evaluation procedures.
TUNNOCK 5303 12-2 2BX
OASIS PETROLEUM NORTH AMERICA LLC · Williams County, ND · File #42902 · Generated 2026-10-14 06:31
- API
- 3310506826
- Target Formation
- Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
Permit approval is directly conditioned on compliance with Order 35053 spacing requirements, wet shoe configuration for the south setback, and specialized casing evaluation procedures.
Permit Cycle Signals (3)
Stipulations section
2026-05-05 (Exact confidence)
Direct regulatory condition tied to permit approval.
Stipulations section
2026-05-05 (Exact confidence)
Technical justification for non-standard setback.
Page 2 of 10
2026-05-05 (Exact confidence)
Specific cement evaluation requirement differentiating this permit.
Historical Context (2)
Drill-back notification obligation per Order No. 31848 for wells traversing adjacent spacing units.
Affidavit dated 2026-02-11 · 2026-02-11
Creates ongoing communication requirements with offset operators for future drilling.
Anti-collision protocols with 1.2 separation safety factor in intermediate sections.
Anti-collision Statement · 2026-01-12
Establishes persistent drilling safety standards for future well operations.
Confidence: High
All signals are extracted from regulator-issued stipulations or operator-submitted technical justifications explicitly referenced in the permit.