The permit approval is directly explained by a Commission Order (34458) conditioning approval on specific setbacks, with a non-routine north setback justified by a wet shoe liner completion. Supporting pre-permit submissions include a waiver request for adjacent operator notification and an anti-col
Chang 4595 42-19 6B
Oasis Petroleum North America LLC · Dunn County, ND · File #43293 · Generated 2026-10-14 06:31
- API
- 3302505245
- Target Formation
- Bakken (Middle Bakken)
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval is directly explained by a Commission Order (34458) conditioning approval on specific setbacks, with a non-routine north setback justified by a wet shoe liner completion. Supporting pre-permit submissions include a waiver request for adjacent operator notification and an anti-collision report mitigating close approaches.
Permit Cycle Signals (4)
Page 1 - STIPULATIONS section
Unknown (Missing confidence)
Permit explicitly ties approval to a specific Commission Order (No. 34458), making it a direct regulatory condition rather than standard setback language.
Page 1 - STIPULATIONS section
Unknown (Missing confidence)
Explicitly links a specific well geometry and completion technique (wet shoe liner) to a modified setback requirement, justifying non-standard north setback.
September 2nd, 2026 letter
2026-09-02 (Exact confidence)
Direct regulatory waiver request submitted pre-permit (9/2/2026) to satisfy a condition of approval (Order No. 31848) for a wellbore traversing adjacent unit.
Anticollision Report - Summary Highlights
2026-08-17 (Exact confidence)
Technical submission justifying wellpath safety and anti-collision mitigation, a prerequisite for permit approval of closely spaced laterals.
Historical Context (3)
Wet shoe liner configuration with intentional 400' of uncemented annulus at toe for wireline perforating.
Wet Shoe section in drilling program · Unknown
Specific completion design imposes operational constraints for stage initiation and cement evaluation, affecting future completion procedures.
Anti-collision constraints with multiple nearby wells (e.g., Franchuk 34-19SWH at 47.81' separation).
Anticollision Report - Offset Listing · 2026-08-17
Persistent proximity to existing wellbores mandates strict survey monitoring and real-time anti-collision protocols during drilling execution.
Filter sock leak-proof container requirement per NDAC 43-02-03-19.2, effective June 1, 2014.
July 29, 2026 letter from NDIC · 2014-06-01
Ongoing regulatory obligation for waste management during drilling, completion, and flowback phases.
Operator Pattern
Operator (Oasis/Chord Energy) utilizes standardized wet shoe liner designs and detailed anti-collision planning for multi-well pads.
Drilling program includes wet shoe design details; anticollision report shows systematic evaluation of nearby wells from same pad (Chang 2BX, Lovegood series).
Confidence: High
Permit stipulations directly reference Order 34458 and a specific well geometry. Supporting documents (waiver request, anticollision report) are dated pre-approval and clearly relevant to permit conditions.