OTHER
The permit approval on 09/15/2026 is directly conditioned by regulator-issued stipulations modifying standard setbacks due to a specific cemented liner and wet shoe design, calculated legal coordinates based on the well's azimuth, a specific simultaneous operations safety rule, and an approved waive
Shell 58-3305H
EOG Resources, Inc. · Mountrail County, ND · File #43305 · Generated 2026-10-14 06:31
- API
- 3306105721
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval on 09/15/2026 is directly conditioned by regulator-issued stipulations modifying standard setbacks due to a specific cemented liner and wet shoe design, calculated legal coordinates based on the well's azimuth, a specific simultaneous operations safety rule, and an approved waiver from adjacent unit notification orders.
Permit Cycle Signals (4)
Permit Information - Stipulations
2026-09-15 (Exact confidence)
Modifies standard setbacks based on specific well geometry (cemented liner with wet shoe) and requires approval to frac out the toe.
Waiver Request Letter (August 27, 2026)
2026-08-27 (Exact confidence)
Specific waiver request for regulatory orders related to notifying adjacent unit operators, directly conditioning permit approval.
Construction Commencement Notification, Page 2
2026-09-15 (Exact confidence)
Calculated legal coordinates specific to this well's azimuth and geometry, a direct condition of the permit.
Permit Information - Conditions of Approval
2026-09-15 (Exact confidence)
Explicit regulatory safety condition tied to the specific location and potential for simultaneous operations.
Historical Context (2)
Shell 59-3305H & Shell392 60-3334H on the referenced well pad are waiting on a hearing for exception location and increase density respectively in October 2026. Permits will be submitted at a later date.
Proposed Work section · Relative
Future pad-mate wells require separate regulatory hearings (exception location, density increase). This creates a forward planning and sequencing constraint for the entire pad development.
EOG must contact NDIC Field Inspector Calob Were prior to location construction.
Construction Commencement Notification, Page 2 · Relative
A specific, named field inspector must be contacted pre-construction. This is a persistent, non-delegable operational requirement for this well location.
Operator Pattern
EOG demonstrates a pattern of requesting waivers from regulatory orders (31848, 31973) for pad developments where they are the sole operator of affected adjacent units.
Waiver request letter dated August 27, 2026, citing EOG's status as operator of all adjacent spacing units as justification.
Confidence: High
The document provides explicit, dated regulatory stipulations and a waiver request directly tied to the permit approval. Key dates (approval, waiver submission) are present. The separation between permit-cycle conditions and historical/future obligations is clear.