COMPLETION
Completion: The permit approval is directly justified by Commission Order 35544, with specific conditions tied to a cemented production liner/wet shoe design and a requirement to be drilled in conjunction with another well meeting a 1220' setback. A pre-permit affidavit shows compliance with off-spacing notific
BUFORD 3-10-15F 2H
DEVON ENERGY WILLISTON, L.L.C · Williams County, ND · File #43307 · Generated 2026-10-14 06:31
- API
- 3310506882
- Target Formation
- BAKKEN
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval is directly justified by Commission Order 35544, with specific conditions tied to a cemented production liner/wet shoe design and a requirement to be drilled in conjunction with another well meeting a 1220' setback. A pre-permit affidavit shows compliance with off-spacing notification requirements per Order 31848.
Permit Cycle Signals (4)
Permit Information - Stipulations
2026-09-16 (Exact confidence)
This is the primary regulatory order explicitly conditioning the permit approval.
Permit Information - Conditions of Approval
2026-09-16 (Inferred confidence)
This is a specific technical stipulation modifying the standard setback requirement for this permit.
State of North Dakota - Affidavit
2026-05-05 (Exact confidence)
This is a pre-permit submission (supporting document) demonstrating compliance with a regulatory order required for permit approval for off-spacing wells.
Permit Information Page 2
2026-09-16 (Inferred confidence)
This is a direct permit condition linking the approval of this well to the execution of another well with specific geometry.
Historical Context (1)
Pursuant to NDIC Order No. 31848, the operator must provide directional drilling and completion plans to operators of adjacent spacing units when a wellbore enters the Bakken system outside the target unit.
State of North Dakota - Affidavit · Unknown
This regulatory order establishes a persistent notification and disclosure obligation for future wells that similarly traverse outside their permitted spacing units.
Confidence: High
The permit document explicitly references the governing Commission Order (35544) and contains multiple specific, non-boilerplate conditions. A dated, notarized affidavit provides clear supporting evidence for a key pre-approval requirement.