COMPLETION
Completion: The permit approval is directly explained by Commission Order 34482 conditioning approval on specific spacing unit setbacks, with a technical justification for the north setback. Additional regulatory conditions include a BLM coordination requirement and a submitted waiver for drilling outside the t
Huron State 44-36 36-25 TF4H
True Oil LLC · McKenzie County, ND · File #43346 · Generated 2026-10-14 06:31
- API
- 3305310896
- Target Formation
- Three Forks
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval is directly explained by Commission Order 34482 conditioning approval on specific spacing unit setbacks, with a technical justification for the north setback. Additional regulatory conditions include a BLM coordination requirement and a submitted waiver for drilling outside the target unit.
Permit Cycle Signals (4)
Page 1 - Stipulations section
Unknown (Missing confidence)
The permit approval is explicitly granted on the condition of meeting these specific spacing unit setbacks, directly referencing a Commission Order.
Page 1 - Stipulations section, following setback condition
Unknown (Missing confidence)
This technical detail provides a specific, non-boilerplate justification for a modified setback requirement (150' north), differentiating it from standard conditions.
Drill Back Waiver Request Letter (located near end of file)
Unknown (Missing confidence)
This waiver request directly addresses a regulatory condition for approval, as the wellbore is noted to enter outside the target unit.
Email from Nathaniel Erbele dated 9/25/2026
2026-09-25 (Exact confidence)
Direct communication from the permitting engineer on the approval date, indicating a specific, non-routine regulatory condition for permit validity.
Historical Context (2)
Waiver and compliance plan for NDIC Order 31848 regarding notification to operators of adjacent spacing units when a wellbore enters the Bakken Petroleum System outside its target unit.
Drill Back Waiver Request Letter · Unknown
The obligation to notify any future operator who permits in the adjacent unit (Sec 1, T147N, R102W) persists beyond this permit's approval and must be executed if conditions change.
Anticollision analysis shows separation factors below 2.0 (as low as 1.852) with offset wells Huron State 44-36 36-25 B3H, requiring 'Collision Risk Procedures'.
Anticollision Report pages (e.g., page referencing '1.852 Collision Risk Procedures Req., SF') · 2025-10-30
The identified collision risk with nearby wells on the pad imposes a persistent operational constraint requiring specific drilling procedures during execution.
Operator Pattern
Proactive submission of regulatory compliance statements (diesel fuel, cuttings disposal, pad containment) and waiver requests ahead of permit application.
File contains dated letters from operator regarding no diesel fuel in fracs, approved cuttings disposal, and pad dike construction.
Confidence: High
The permit document contains explicit, regulator-written stipulations that condition approval. Supporting waiver requests and direct regulator correspondence are present and clearly dated or contextualized.