← Back to Daily Permits
SUNDRY
Sundry: The permit approval is directly justified by a Commission Order (35997) imposing specific wellbore placement and setback conditions. A technical justification for the south setback condition is provided. A required pre-permit notification to an adjacent unit operator was completed.
HOBBIT 30-31-6-7 1H-LL
Phoenix Operating LLC · Divide County, ND · File #43352 · Generated 2026-10-14 06:31
- API
- 3302301893
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval is directly justified by a Commission Order (35997) imposing specific wellbore placement and setback conditions. A technical justification for the south setback condition is provided. A required pre-permit notification to an adjacent unit operator was completed.
Permit Cycle Signals (3)
Permit Stipulations section (Page 1)
Unknown (Missing confidence)
This is a direct regulatory condition tied to a specific Commission Order, mandating a precise wellbore placement and setback from unit boundaries, differentiating it from routine approvals.
Permit Stipulations section (Page 1)
2026-09-29 (Exact confidence)
Provides a technical justification (completion design with wet shoe) for a specific permit condition (south setback), linking regulatory approval to operational engineering.
Notarized affidavit at end of file
2026-06-16 (Exact confidence)
Demonstrates fulfillment of a pre-permit regulatory notification requirement (Order 31848) for drilling into an adjacent unit, a prerequisite for permit approval.
Historical Context (1)
NDIC Order No. 35997 requires one horizontal well to be drilled and completed in both the 1280-acre and 2560-acre spacing units prior to completing any horizontal well in the 5120-acre standup lease-line spacing unit.
Permit Stipulations section (Page 1) · Unknown
This is a persistent, multi-well development sequencing obligation that governs future completion activity on the pad, not just the drilling of this permit.
Operator Pattern
Operator follows regulatory notification protocols for off-pad drilling and submits technical justifications for permit conditions.
Submitted affidavit for NDIC Order 31848 notification; included detailed engineering rationale (wet shoe) for setback condition in permit stipulations.
Confidence: High
Key justifying documents (permit stipulations citing Order 35997, notarized affidavit) are present and clearly linked to the permit action. No evidence of missing core regulatory documents.