SUNDRY
Sundry: The permit approval is directly conditioned by specific stipulations referencing Commission Order 35806. These stipulations impose a well sequencing requirement and a defined drilling corridor with setbacks justified by a specific completion design (wet shoe). An adjacent unit notification affidavit
HOBBIT 29-32 4H
Phoenix Operating LLC · Divide County, ND · File #43353 · Generated 2026-10-14 06:31
- API
- 3302301894
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval is directly conditioned by specific stipulations referencing Commission Order 35806. These stipulations impose a well sequencing requirement and a defined drilling corridor with setbacks justified by a specific completion design (wet shoe). An adjacent unit notification affidavit fulfills a pre-approval requirement.
Permit Cycle Signals (4)
Permit Information - STIPULATIONS - SPECIAL ATTENTION
2026-09-29 (Exact confidence)
This stipulation creates a specific sequencing requirement tied to spacing unit phasing, which is non-routine and directly conditions permit validity.
Permit Information - STIPULATIONS - NDIC Field Order Info
2026-09-29 (Exact confidence)
Directly ties permit approval to a specific Commission Order and imposes a non-standard, geometry-specific drilling corridor and setback condition.
Permit Information - STIPULATIONS - NDIC Field Order Info
2026-09-29 (Exact confidence)
Provides a specific technical justification (wet shoe/frac-out capability) for a permit condition, moving beyond generic setback rules.
Affidavit of Notification (State of Colorado)
2026-06-16 (Exact confidence)
Demonstrates fulfillment of a pre-permit regulatory requirement (adjacent unit notification) tied to Commission Order 31848, which is likely a prerequisite for permit approval.
Historical Context (2)
Adjacent spacing unit notification requirement established by NDIC Order No. 31848 for wells entering the Bakken Petroleum System outside the target spacing unit.
Affidavit of Notification (State of Colorado) · Unknown
Order 31848 establishes a persistent regulatory obligation for the operator regarding future wells that drill into adjacent units, requiring plan sharing and notification.
Anti-collision review requirement for wells within 500' of proposed wellbore.
Permit Page 7 - Operator Assertions · 2026-09-29
This is a standing operational safety requirement that will apply to all future drilling activities on this pad and in proximity to existing wellbores.
Confidence: High
Permit document contains explicit, non-routine stipulations and conditions directly tied to the approval. Supporting affidavit is contemporaneous and clearly linked to a regulatory requirement. Text extraction is clear for key sections.