OTHER
Wellfile updated - +5 pages
HOBBIT 1 SWD
Phoenix Operating LLC · Divide County, ND · File #43375 · Generated 2026-11-27 02:13
- API
- 3302301903
- Target Formation
- Inyan Kara Formation (Dakota Group)
- Permit Explained
- Yes
Permit Cycle Assessment
Contemporaneous documentation directly explains the permit. The UIC Order (36272) is the foundational authorization. The fracture analysis justifies the injection pressure limit, and the anticollision report satisfies well proximity requirements.
Permit Cycle Signals (3)
Order No. 36272, pages following APPROVED BY section
2026-10-05 (Exact confidence)
This is the direct regulatory order that precedes and conditions the permit issuance.
Well Fracture Analysis sheet
2026-09-10 (Exact confidence)
The technical submission justifies the maximum injection pressure stipulated in the permit.
Appendix B: Corrective Action Statement and Anticollision Report
2026-05-26 (Exact confidence)
This addresses the regulatory requirement to review wells within 500' and demonstrates compliance, a prerequisite for permit approval.
Historical Context (2)
A tank diking variance is approved contingent on submission of an as-built site schematic after facility construction.
Permit Stipulations, page 3 · 2026-10-05
This variance condition imposes a post-construction reporting obligation that must be fulfilled.
Road Share Agreements with Frederick Township (effective August 20, 2026) and Palmer Township (effective August 24, 2026) grant access and define maintenance responsibilities for specific road segments.
Appendix F: Approach Permit & Traffic Flow Diagram · 2026-08-20 | 2026-08-24
These are multi-year agreements that govern site access and require ongoing operator maintenance.
Operator Pattern
Operator is co-locating SWD facilities with production wells on a multi-well pad and intends the SWD to service on-pad wells.
UIC Plan states 'The proposed well is to be utilized by wells drilled from the same well pad' and Appendix D lists permitted on-pad wells as fluid sources.
Confidence: High
The permit (Order 36272), key technical submissions (fracture analysis, anticollision report), and supporting application materials (UIC plan, appendices) are all present and dated closely around the permit approval date of October 5, 2026.