← Back to Daily Permits
SUNDRY
Sundry: The permit contains a contemporaneous, regulatory-issued explanation. Approval is directly conditioned on drilling back-to-back with an adjacent well, compliance with Order 35009, and a modified north setback due to a wet shoe liner design.
Updated 2026-10-14 · was Oct 12, 2026 · Full diff →

BR-DANI AUTUMN 36-24H MB

MUREX PETROLEUM CORPORATION · Divide County, ND · File #43378 · Generated 2026-10-14 06:31

API
3302301906
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit contains a contemporaneous, regulatory-issued explanation. Approval is directly conditioned on drilling back-to-back with an adjacent well, compliance with Order 35009, and a modified north setback due to a wet shoe liner design.

Permit Cycle Signals (3)

Approval conditioned on drilling back-to-back with BR-CJ Hana 36-24H MB to justify spacing unit.
Direct
Permit Information - STIPULATIONS - SPECIAL ATTENTION
2026-10-06 (Exact confidence)
Explicitly ties permit approval to a specific operational sequence required by the regulator.
Approval conditioned on Commission Order No. 35009 with specific lateral setbacks (100' N, 150' S, 500' E/W) within the 1920-acre spacing unit.
Direct
Permit Information - NDIC Field Order Info
2026-10-06 (Exact confidence)
Permit approval is explicitly granted 'pursuant to' and conditioned on this order.
North setback modification based on a cemented liner with a wet shoe and inability to frac out the shoe.
Direct
Permit Information - Conditions of Approval
2026-10-06 (Exact confidence)
Modifies standard setback due to specific, non-routine wellbore design (wet shoe).

Historical Context (3)

Surface Use Agreement executed July 1, 2026, authorizing a multi-well pad and 'off-spacing' operations for at least four wells.
Affidavit of Jake Scott (Surface Use Agreement) · 2026-07-01
The agreement is the legal foundation for the pad location and multi-well development plan, including drilling into off-spacing units.
Waiver of drillback affidavit requirement per NDIC Order 31973, as Murex is the operator of the adjacent spacing unit.
Drillback Waiver letter · 2026-09-28
This waiver eliminates a procedural step for the operator but confirms the wellbore will traverse an adjacent unit, a persistent geometric constraint.
Contract with NextEra for the spacing units of the four wells on the Bradley Robert Pad.
Affidavit of Information (Ty Jackson) · 2026-07-21
Defines the marketing/working interest arrangement that governs production from the wells, affecting future revenue distribution.

Operator Pattern

Multi-well pad development with integrated surface planning and standardized wellbore designs (cemented liner with wet shoe).
Single pad layout for four wells (S-3, C-1), coordinated drilling program statement (Oct 2, 2026), consistent well design schematic.
Confidence: High
Permit document contains explicit, regulator-issued stipulations that directly condition the approval. Key dates (approval, submissions) are present. Supporting historical documents are clearly dated and relevant.