COMPLETION
Completion: The permit contains contemporaneous regulatory stipulations and conditions that directly explain approval, including back-to-back drilling requirement, Order 34628 setbacks, wet shoe geometry justification for modified setback, and positional limits. Regulatory waivers and technical submissions supp
BR-MICAH ANDREW 1-13H MB
MUREX PETROLEUM CORPORATION · Divide County, ND · File #43379 · Generated 2026-10-14 06:31
- API
- 3302301907
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit contains contemporaneous regulatory stipulations and conditions that directly explain approval, including back-to-back drilling requirement, Order 34628 setbacks, wet shoe geometry justification for modified setback, and positional limits. Regulatory waivers and technical submissions support these conditions.
Permit Cycle Signals (5)
STIPULATIONS section, SPECIAL ATTENTION
Unknown (Missing confidence)
Imposes drilling sequence condition for permit approval tied to spacing unit justification
NDIC Field Order Info section
Unknown (Missing confidence)
Permit approval explicitly conditioned on compliance with setback requirements from Order 34628
Conditions of Approval section
Unknown (Missing confidence)
Non-standard geometry (wet shoe liner) justifies specific 100' south setback condition
Page 2, after groundwater protection paragraph
Unknown (Missing confidence)
Permit approval includes legally defined positional limits for casing point and TD based on well geometry
DRILLBACK WAIVER section
2026-09-28 (Exact confidence)
Pre-permit waiver required and submitted to address regulatory requirement for wells entering adjacent units
Historical Context (3)
Drillback waiver requirement per Order 31973 for wells entering adjacent spacing units persists for this permit group
DRILLBACK WAIVER section · 2026-09-28
Creates ongoing obligation for operator to provide documentation to adjacent unit operators when drilling across boundaries
Surface Use Agreement authorized drilling both DSUs from same pad, enabling revised drilling program for efficiency
October 2, 2026 Drilling Plan Statement · 2026-10-02
Multi-well pad configuration and coordinated drilling sequence established for current and future well operations
Wet shoe liner design with specific cement displacement and fracture isolation methodology
WET SHOE SCHEMATIC section · Unknown
Completion design constraints fracture initiation and requires specific plug placement that affects future operations
Confidence: High
Permit contains clear regulatory stipulations, conditions referencing specific orders, and technical submissions that directly correspond to approval requirements. Document provides explicit permit-cycle explanations.