Sundry: The permit contains specific, non-routine conditions that directly justify its approval: a requirement to drill concurrently with another well to justify spacing, a modified south setback based on a wet shoe liner design, and enhanced casing/cementing requirements for deep surface casing.
LIPPERT 1-12-13-24 1H
DEVON ENERGY WILLISTON, L.L.C. · Williams County, ND · File #43388 · Generated 2026-10-14 06:31
- API
- 3310506909
- Target Formation
- Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit contains specific, non-routine conditions that directly justify its approval: a requirement to drill concurrently with another well to justify spacing, a modified south setback based on a wet shoe liner design, and enhanced casing/cementing requirements for deep surface casing.
Permit Cycle Signals (3)
Page 3 of 11, Conditions of Approval
Unknown (Missing confidence)
Directly ties permit approval to a specific, non-routine operational requirement (co-drilling with another well) that justifies the large spacing unit, beyond standard setback rules.
Page 1 of 11, Conditions of Approval
Unknown (Missing confidence)
Explicitly modifies the standard 150' setback rule for the south boundary based on a specific engineered wellbore construction (wet shoe liner), justifying the permit geometry.
Page 2 of 11, Conditions of Approval
Unknown (Missing confidence)
Imposes specific, non-routine technical and monitoring requirements tied to the deep surface casing design, conditioning the permit approval.
Historical Context (2)
Wellbore is proposed to enter the Bakken Petroleum System outside the target spacing unit, requiring notification to the operator of the adjacent spacing unit (Neptune Operating LLC) per Order 31848.
Operator Affidavit (Yani Durden) · 2026-08-25
Creates a persistent notification obligation and operational coordination requirement with an adjacent operator for the life of the well's drilling and completion activities.
The Hardscrabble-Bakken Pool is formally defined within the permit approval.
Page 1 of 11, Conditions of Approval · Unknown
Establishes the formal regulatory pool definition that governs production and future regulatory actions for this well and others in the area.
Operator Pattern
Operator employs engineered wellbore designs (wet shoe liner) and co-drilling plans to navigate regulatory constraints like large unit setbacks.
South setback justification based on wet shoe liner design; permit conditioned on drilling a companion well to justify spacing unit.
Confidence: High
Permit document contains explicit, non-routine stipulations directly tied to Commission Order 34586 that condition the approval. Key signals are regulator-issued and not boilerplate.