FURY 2-1-6-5F 2H

DEVON ENERGY WILLISTON, L.L.C. · Williams County, ND · File #43390 · Generated 2026-10-14 06:31

API
3310506911
Target Formation
BUFORD-BAKKEN
Permit Explained
Yes

Permit Cycle Assessment

The permit contains contemporaneous documentation explaining the approval. The Conditions of Approval explicitly reference Commission Order 35140 and justify a 150' east setback based on a production liner with wet shoe design. Pre-permit correspondence shows regulatory compliance with spacing unit notifications and federal coordination requirements.

Permit Cycle Signals (5)

Permit approval conditioned on 150' east setback due to production liner with wet shoe design allowing frac out the shoe, while other boundaries require 500' setback.
Direct
Page 1: Conditions of Approval
2026-10-08 (Exact confidence)
Specific setback modification for east boundary justifies unique well design and completion technique referenced in permit approval.
September 11, 2026 letter from Devon to NDIC confirms compliance with NDIC Order 31973 for wells entering adjacent spacing unit, noting Devon is operator of adjacent unit so no additional notification required.
Supporting
Letter from Devon Energy to Todd Holweger, NDIC
2026-09-11 (Exact confidence)
Pre-permit submission demonstrates regulatory compliance for multi-well pad crossing spacing unit boundaries, directly supporting permit approval.
October 8, 2026 email from NDIC engineer to operator regarding potential Federal permit requirement due to spacing unit composition, instructing contact with BLM Dickinson office.
Direct
Email from Nathaniel Erbele to Yani Durden
2026-10-08 (Exact confidence)
Regulatory correspondence on approval date highlights specific jurisdictional consideration for this spacing unit that may have conditioned approval.
Permit references Commission Order No. 35140 as basis for approval and defines Buford-Bakken Pool boundaries.
Direct
Page 1: Conditions of Approval
Relative (Inferred confidence)
Explicit regulatory order cited as authorization for this specific permit approval.
Drilling plan includes wet shoe design with ability to frac out the toe, which justifies the modified east setback condition.
Supporting
Proposed Drilling Plan - Section Details
Unknown (Missing confidence)
Technical design element directly supports and is referenced in permit's unique setback condition.

Historical Context (3)

NDIC Order 31973 requires operators to provide directional drilling and completion plans to adjacent spacing unit operators when wellbore traverses through adjacent unit.
September 11, 2026 Devon letter referencing NDIC Order 31973 · Relative
Creates ongoing notification obligation for future wells that cross spacing unit boundaries, requiring pre-drill coordination with adjacent operators.
Wellbore traverses through adjacent spacing unit (enters Bakken Petroleum System outside target spacing unit per Devon letter).
September 11, 2026 Devon letter and Completion Intervals showing 2560-acre spacing unit across four sections · 2026-09-11
Establishes precedent and operational pattern for multi-section spacing units and cross-boundary drilling that will affect future permit applications and unit coordination.
Spacing unit composition (Sections 1,2,5,6 across Townships 152N, Ranges 103W and 104W) triggers potential federal permitting requirements due to federal mineral ownership.
October 8, 2026 NDIC email and Completion Interval legal description · 2026-10-08
Future permits in this area will require BLM coordination, adding regulatory layer and timing consideration for approval.

Operator Pattern

Proactive regulatory compliance with pre-submission of required notifications and documentation for multi-well pads crossing spacing units.
September 11, 2026 letter demonstrates Devon self-identifying compliance with Order 31973 for all five wells on pad before permit approval.
Confidence: High
Permit contains explicit Conditions of Approval with technical justification for setback modification, plus dated regulatory correspondence directly tied to permit approval. Well file includes both direct regulatory conditions and supporting technical/regulatory submissions.