← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
SHIV 13-24-25-36 1H
Phoenix Operating LLC · McKenzie County, ND · File #43398 · Generated 2026-11-27 02:13
- API
- 3305310902
- Target Formation
- Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit contains contemporaneous documentation explaining its approval. The stipulations directly reference Commission Order 35175 and impose specific geometric conditions and a wellbore construction requirement (wet shoe/frac-out capability). Supporting submissions include a waiver request for backbuild order notifications and a surface damage affidavit, both addressing non-routine conditions tied to the well's off-spacing unit trajectory.
Permit Cycle Signals (5)
Permit Information page, STIPULATIONS section
Relative (Inferred confidence)
The permit is explicitly conditioned on a prior Commission Order and modified setbacks tied to a specific spacing unit and well geometry.
Permit Information page, Conditions of Approval section
Relative (Inferred confidence)
Justifies a specific wellbore construction (wet shoe) to satisfy setback requirements, differentiating it from standard conditions.
Permit Information page 2, Conditions of Approval section
Relative (Inferred confidence)
A specific, non-standard condition tied to the well's spacing unit justification, linking its approval to another well's geometry.
Letter dated June 17th, 2026 from Phoenix Energy to NDIC
2026-06-17 (Exact confidence)
Directly addresses a regulatory notification requirement for wells entering the Bakken system outside the target spacing unit, a condition for permit approval.
Affidavit of Surface Damage Agreement
2026-09-21 (Exact confidence)
A required legal document for off-spacing unit drilling, submitted as part of the permit application package.
Historical Context (2)
Existing well proximity and anticollision obligations persist. The well file includes a detailed directional plan showing nearby wells (Leatherman series, Woody Watson 1).
Directional plan visuals and well proximity map · Unknown
Future drilling and completion operations (e.g., hydraulic fracturing) must manage anticollision risks with these offset wells.
The pad location requires specific earthwork and containment berms for secondary containment, as detailed in engineering plans.
Pad layout, cross-sections, and containment volume evaluation · Unknown
These are permanent pad design constraints that govern all operations from this location, including future wells.
Operator Pattern
Operator uses multi-well pads and engages in off-spacing unit drilling from a single surface location, requiring surface use agreements and regulatory waivers.
Affidavit covers multiple wells (Leatherman and Shiv series); waiver request letter addresses backbuild order for all wells on the pad.
Confidence: High
The permit stipulations and supporting letters are clearly dated and directly address the conditions of approval. Text extraction is clear for key documents.