SHIV 13-24-25-36 2H

Phoenix Operating LLC · McKenzie County, ND · File #43399 · Generated 2026-11-27 02:13

API
3305310903
Target Formation
Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit approval is directly explained by Commission Order 35175, which imposes specific geometric constraints on the wellbore within the multi-section spacing unit. The approval is further conditioned on a technical design feature (cemented liner with wet shoe) justifying the south setback, a pre-construction inspector notification, and is supported by a waiver request for adjacent unit notification requirements.

Permit Cycle Signals (4)

Approval is conditioned on wellbore being no closer than 150' setback from north & south boundaries and 1220' setback from east & west boundaries within the 2560-acre spacing unit (S13, 24, 25, 36, T146N, R99W), per Commission Order No. 35175.
Direct
Permit Stipulations section
Unknown (Missing confidence)
Direct regulatory order conditioning permit approval with specific geometric constraints for the lateral in a multi-section unit.
The south setback condition is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Direct
Permit Stipulations section
Unknown (Missing confidence)
Direct technical justification (liner design) for a specific permit condition (south setback), differentiating it from routine setbacks.
Waiver request for 'Backbuild Order' notification requirements (NDIC Orders 31848 & 31973) because Phoenix Energy is the majority working interest owner in adjacent spacing units.
Supporting
Letter from Meaghan Coughlan, Senior Regulatory Specialist, dated June 17th, 2026
2026-06-17 (Exact confidence)
Supporting submission justifying non-application of a standard regulatory requirement, conditioning permit approval by addressing off-spacing entry.
Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location construction.
Direct
Permit Stipulations - Construction Commencement Notification
Unknown (Missing confidence)
Direct, non-routine pre-construction condition attached to the permit approval.

Historical Context (2)

Affidavit confirms a surface use agreement is in place for the LEATHERMAN-SHIV Pad, covering multiple off-spacing wells drilled from Section 12.
Affidavit of Surface Damage Agreement, executed September 21, 2026 · 2026-09-21
This is a persistent surface owner obligation that governs all pad operations and is required for off-spacing drilling.
Wellbore must maintain specific anti-collision clearances from existing wells (LEATHERMAN 12-1-36-25 1H, 2H, 3H, 4H, SHIV 1 SWD, SHIV 13-24-25-36 1H, 3H, 4H) as shown on directional plan.
Directional plan map and annotations · 2026-06-13
These are persistent, forward-execution constraints that dictate the allowable drilling corridor to avoid existing wellbores.

Operator Pattern

Utilizes multi-well pad development with complex trajectories targeting multiple spacing units from a single surface location.
Directional plan shows pad with 8 proposed laterals (4 LEATHERMAN, 4 SHIV). Affidavit and waiver request confirm coordinated development of off-spacing wells from the LEATHERMAN-SHIV Pad.
Confidence: High
The permit stipulations contain direct references to the regulatory order and technical design justifying the approval. Supporting waiver request and affidavit are clearly dated and relevant. Key documents are legible and unambiguous.