← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
First detected 2026-10-20 · was Oct 13, 2026 · +1 page · Full diff →

SHIV 13-24-25-36 3H

Phoenix Operating LLC · McKenzie County, ND · File #43400 · Generated 2026-11-27 02:13

API
3305310904
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit is explicitly justified by Commission Order 35175, with direct conditions including unique setbacks tied to wellbore geometry and a wet shoe completion design. A supporting waiver request addresses traversing adjacent units.

Permit Cycle Signals (4)

Approval is granted conditionally upon adherence to specific setbacks within the 2560-acre spacing unit: 150' from north & south boundaries and 500' from east & west boundaries. The south setback is specifically justified based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Direct
Permit Information - STIPULATIONS section
Relative (Inferred confidence)
The stipulation directly ties permit approval to a specific geometric constraint (setbacks) and provides a unique technical justification (liner with wet shoe) for the south boundary exception.
Permit approval is given "Pursuant to Commission Order No. 35175".
Direct
Permit Information - STIPULATIONS section
Unknown (Missing confidence)
Identifies the specific regulatory order that authorized the drilling permit, making it the foundational legal basis for approval.
Operator submitted a waiver request for the Backbuild Order (NDIC Orders 31848 & 31973), stating that Phoenix Energy is the majority working interest owner of the adjacent spacing units the wellbore traverses, thus no additional notification to adjacent operators is necessary.
Supporting
Letter from Phoenix Energy (Meaghan Coughlan) to Todd Holweger dated June 17th, 2026
2026-06-17 (Exact confidence)
This is a specific waiver submission to circumvent standard notification requirements for wells entering target zones outside their spacing unit, directly conditioning permit approval.
Construction Commencement Notification: Phoenix must contact NDIC Field Inspector Doug Dolyniuk prior to location construction.
Direct
Permit Information - Conditions of Approval
Relative (Inferred confidence)
A specific, non-boilerplate condition tied to a named inspector, imposing a direct pre-construction action as part of permit approval.

Historical Context (2)

Surface Use Agreement Affidavit executed for the LEATHERMAN-SHIV Pad, covering multiple wells including this one. Acknowledges drilling multiple wells off-spacing from a surface location in Section 12.
Affidavit of Surface Damage Agreement · 2026-09-21
Establishes a binding surface owner agreement that permits off-spacing operations from this pad, a legal prerequisite that persists for all pad wells.
The wellbore trajectory shows the well will be drilled from a surface location in Section 12 into a target spacing unit consisting of Sections 13, 24, 25, and 36 (2560 acres).
Permit Stipulations and Directional Survey/Planning Report · Relative
Defines the non-standard, cross-boundary drilling path that must be maintained during execution to comply with the permitted spacing unit and setbacks.

Operator Pattern

Operator utilizes pad drilling from a single surface location to target multiple, non-contiguous spacing units, requiring regulatory waivers for unit traversal.
Affidavit and waiver letter reference multiple wells (LEATHERMAN and SHIV series) from the same pad, with the SHIV wells specifically entering the Bakken outside their target spacing unit, necessitating the Backbuild Order waiver.
Confidence: High
Key permit explanation documents (stipulations referencing Order 35175, specific setback justification, waiver request letter) are present and directly address the conditions of the anchored permit approval. Historical signals are clearly separated and pertain to ongoing pad-level obligations.