← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
First detected 2026-10-20 · was Oct 15, 2026 · +1 page · Full diff →

MESSERSMITH 14-11-2-35 3H

Phoenix Operating LLC · Mountrail County, ND · File #43410 · Generated 2026-11-27 02:13

API
3306105723
Target Formation
BAKKEN
Permit Explained
Yes

Permit Cycle Assessment

Permit approval is explicitly tied to Commission Order 35207 and includes modified boundary setbacks justified by specific completion design. Required affidavits regarding surface damage agreements and adjacent operator notifications were filed two days prior, satisfying off-spacing preconditions.

Permit Cycle Signals (4)

Approval conditioned on 150' setback from north & south boundaries and 500' setback from east & west boundaries within 2560-acre spacing unit, with north setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
Direct
Stipulations section of permit document
2026-10-14 (Exact confidence)
Modifies standard setback requirements and ties approval to specific completion design (wet shoe) to address boundary proximity
Commission Order No. 35207 cited as basis for approval to drill
Direct
Stipulations section
Relative (Inferred confidence)
Permit approval explicitly tied to existing commission order governing spacing or unitization
Affidavit of Surface Damage Agreement executed for off-spacing wells including this well, acknowledging landowner awareness of multiple off-spacing wells from pad
Supporting
Affidavit of Surface Damage Agreement
2026-10-12 (Exact confidence)
Required precondition for off-spacing approval; submitted two days before permit approval
Operator notification to adjacent operators (EOG Resources, Inc., SOGC, Inc.) of directional plan, timing, and contact info as required by NDIC Orders 31973 and 31848
Supporting
Affidavit/Notice section
2026-10-12 (Exact confidence)
Regulatory requirement for off-spacing wells; executed two days before permit approval

Historical Context (2)

Off-spacing designation requiring executed surface damage agreement and operator notifications
Affidavit of Surface Damage Agreement and operator notification affidavit · 2026-10-12
Creates ongoing landowner relationship obligations and establishes precedent for multi-well pad development outside standard spacing units.
NDIC Order Numbers 31973 and 31848 require notification to operators of adjacent spacing units with directional plans and contact information
Operator notification affidavit · Unknown
Imposes persistent duty to coordinate with adjacent operators for any future wells drilled from this pad into adjacent units.

Operator Pattern

Multi-well pad development with off-spacing trajectories
Affidavit references four wells (MESSERSMITH, VICTORIA, two GEORGE wells) all drilled off-spacing from same pad in Section 23.
Confidence: High
Direct regulatory references exist in permit stipulations. Contemporaneous supporting documents (affidavits) are dated close to approval and clearly address off-spacing requirements. No missing critical dates in key documents.