Ross 58-0615H

EOG RESOURCES, INC. · Mountrail County, ND · File #43411 · Generated 2026-11-27 02:13

API
3306105724
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit contains contemporaneous documentation explaining its approval. The stipulations section directly cites Commission Orders 35122 & 35123 as the authority for approval and imposes specific conditions, including unit-specific setbacks justified by a cemented liner with a wet shoe design. Non-routine pre-construction notifications and standard timing constraints are also specified.

Permit Cycle Signals (5)

Permit approval conditioned on compliance with setback distances (150' from N/S boundaries, 500' from E/W boundaries) within the Alger-Bakken Unit, specifically noting the south setback is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe
Direct
PERMIT INFORMATION section, STIPULATIONS/Conditions of Approval
2026-10-15 (Exact confidence)
The setback condition is explicitly tied to a specific well construction detail (cemented liner with wet shoe) that justifies a variation from standard setbacks, directly conditioning permit approval.
Permit approval granted pursuant to Commission Order No. 35122 & 35123
Direct
PERMIT INFORMATION section, STIPULATIONS
Unknown (Missing confidence)
This is the direct regulatory authority (Commission Orders) cited for granting the drilling approval, making it the foundational legal basis for the permit.
EOG must contact NDIC Field Inspector Dylan Roach prior to location construction
Direct
Page 2 of 10, Construction Commencement Notification
Relative (Inferred confidence)
This is a specific, non-routine pre-construction contact requirement tied to this permit's approval, differing from the generic publication waiting period mentioned in the same section.
Operators shall not commence until 3rd business day after permit publication unless waived by the Director
Direct
Page 2 of 10, Construction Commencement Notification
Relative (Inferred confidence)
This is a standard permit condition, but its inclusion as a stipulation directly constrains the timing of operations post-approval.
Waiver requested for proposed logs (must be requested via separate sundry)
Supporting
Page 4 of 10, GEOLOGIC INFORMATION / PROPOSED LOGS
2026-09-28 (Exact confidence)
This is a specific regulatory waiver request submitted with the APD that conditioned the permit's technical evaluation requirements, though final approval of the waiver is pending.

Historical Context (2)

The Alger-Bakken Unit is defined with a specific stratigraphic interval based on a log from the Erie #44-19H well (File No. 17289)
PERMIT INFORMATION section, STIPULATIONS · Unknown
This unit definition is a structural, lasting geological and regulatory framework that governs the productive formation for this and future wells within the unit, affecting completions and reporting.
Completion technique changes within the Bakken-Three Forks Petroleum System require prior NDIC approval
Page 9 of 10, operator understandings · Relative
This is a persistent, forward-looking regulatory constraint on all subsequent completion operations for this well, requiring agency engagement for any design modifications.

Operator Pattern

Operator utilizes multi-well pad development with detailed pad construction and reclamation plans, and submits batch permit applications with consolidated affidavits (e.g., hydraulic fracture fluids affidavit for four wells).
Well file includes extensive pad layout diagrams (Ross 5 NENW) for multiple wells, detailed cut/fill calculations, reclamation layouts, and a single affidavit covering Ross 58-0615H, 115-0515H, 59-0515H, and 116-0515H wells.
Confidence: High
The permit document's STIPULATIONS section provides clear, direct explanation for approval (Commission Orders, conditioned setbacks). Supporting technical submissions (waiver request, affidavit) are date-stamped and logically connected to the permit cycle. Historical context is well-segregated into unit definitions and persistent operator obligations.