OTHER
Wellfile updated - +2 pages
First detected 2026-11-02 · was Oct 19, 2026 · +2 pages · Full diff →

Ross 115-0515H

EOG RESOURCES, INC. · Mountrail County, ND · File #43412 · Generated 2026-11-27 02:13

API
3306105725
Target Formation
Three Forks First Bench
Permit Explained
Yes

Permit Cycle Assessment

The permit approval is directly conditioned on and explained by two Commission Orders (35122 & 35123) which impose non-standard unit setbacks justified by a specific cemented liner completion design with a wet shoe. Supporting technical submissions include the unit definition, a pre-construction contact requirement, and a request to frac out the liner toe.

Permit Cycle Signals (5)

Approval is conditionally granted per Commission Order No. 35122 & 35123, with special setbacks (150' N/S, 500' E/W) within the Alger-Bakken Unit. South setback is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Direct
PERMIT INFORMATION - STIPULATIONS - NDIC Field Order Info
Unknown (Missing confidence)
Directly ties permit approval to specific Commission Orders and modifies standard setback rules based on a unique wellbore completion design (cemented liner with wet shoe).
Defines the Alger-Bakken Unit common source of supply using a specific log from the Erie #44-19H well as reference.
Direct
PERMIT INFORMATION - STIPULATIONS - Conditions of Approval
Unknown (Missing confidence)
Establishes the specific geologic definition and unit boundaries that govern this permit's approval for a unitized well.
EOG must contact NDIC Field Inspector Dylan Roach prior to location construction.
Direct
Page 2 of 10 - Construction Commencement Notification
Relative (Inferred confidence)
A pre-spud regulatory contact requirement specific to this well, conditioning the start of operations.
Based on the proposed lateral azimuth, the maximum legal coordinate from the well head at Total Depth is 16056' south.
Direct
Page 2 of 10 - Bottom of page
Relative (Inferred confidence)
A specific geometric calculation tied to this well's directional plan, indicating regulatory review of the extended reach.
EOG requests permission to frac out the toe (of the production liner).
Supporting
Drilling Plan - CEMENT SEGMENTS / Notes
Unknown (Missing confidence)
A direct operational request (waiver/authorization) related to the cemented liner completion method cited in the permit's primary condition.

Historical Context (2)

Alger-Bakken Unit definition and associated Commission Orders (35122 & 35123) establish a persistent unitized regulatory framework.
PERMIT INFORMATION - STIPULATIONS - NDIC Field Order Info & Conditions of Approval · Unknown
All future operations, regulatory compliance, and potential changes for wells in this unit are governed by these orders and the defined unit boundaries.
Mission Canyon Formation is identified as a known H2S zone in the basin. An H2S plan is referenced as attached.
Drilling Plan - ABNORMAL CONDITIONS · Unknown
Imposes ongoing safety and operational planning obligations for drilling through this formation, requiring implementation of the referenced H2S plan.
Confidence: High
The permit document contains explicit, contemporaneous stipulations that cite specific Commission Orders and tie approval conditions directly to the well's unique cemented liner design. Key dates (Commission Order dates) are missing, but the explanatory link is clear and direct.