← Back to Daily Permits
OTHER
Wellfile updated - +2 pages
Ross 59-0515H
EOG RESOURCES, INC. · Mountrail County, ND · File #43413 · Generated 2026-11-27 02:13
- API
- 3306105726
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit is explicitly conditioned on Commission Orders 35122 & 35123, which define special setbacks for the Alger-Bakken Unit and justify a specific wellbore design. A pre-construction contact requirement for the field inspector and a diesel fuel affidavit provide additional, direct regulatory context for the approval.
Permit Cycle Signals (3)
Stipulations section, first page
2026-10-15 (Exact confidence)
This is the core regulatory condition explicitly conditioning the permit approval. It modifies standard setbacks for a unitized formation and justifies a specific wellbore construction (wet shoe).
Page 2, Construction Commencement Notification
2026-10-15 (Exact confidence)
This is a specific, non-routine requirement added to the permit's standard conditions, creating a direct regulatory touchpoint tied to this approval.
Affidavit in Re Hydraulic Fracture Fluids
2026-09-28 (Exact confidence)
This is a required supporting document for permit approval, directly justifying compliance with a specific federal regulatory mandate.
Historical Context (2)
The Alger-Bakken Unit formation is formally defined within the permit, referencing a specific log from the Erie #44-19H well (File 17289). This definition applies to the entire unitized area.
Stipulations section, Conditions of Approval · 2026-10-15
This geological definition establishes the official stratigraphic boundaries for the unitized pool. It is a structural condition that governs all future development, completion, and regulatory reporting within the Alger-Bakken Unit, not just this well.
The Mission Canyon Formation is identified as a known H2S zone in the basin, with an attached H2S plan referenced.
Drilling Program section, ABNORMAL CONDITIONS · Unknown
This is a persistent geological hazard. The obligation to have and follow an H2S safety plan extends through drilling, completion, and production phases for any activity penetrating this formation.
Confidence: High
The permit document contains explicit, direct stipulations that condition the approval on specific Commission Orders. Supporting affidavit and non-routine contact requirements are clearly presented. The temporal anchor (permit approval date) and key regulatory references are unambiguous.