← Back to Daily Permits
OTHER
Wellfile updated - +2 pages
Ross 116-0515H
EOG RESOURCES, INC. · Mountrail County, ND · File #43414 · Generated 2026-11-27 02:13
- API
- 3306105727
- Target Formation
- Three Forks First Bench
- Permit Explained
- Yes
Permit Cycle Assessment
The permit contains contemporaneous explanation. Approval is explicitly granted pursuant to Commission Orders 35122 & 35123 and conditioned on specific Alger-Bakken Unit setbacks (500' south, 150' east). The 150' east setback is justified by a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Permit Cycle Signals (4)
Page 1: STIPULATIONS - NDIC Field Order Info
Unknown (Missing confidence)
This approval condition directly references specific, non-standard setback requirements (500' south, 150' east) within the Alger-Bakken Unit, which differentiate it from routine horizontal approvals and justify the permit geometry.
Page 1: STIPULATIONS - NDIC Field Order Info
Unknown (Missing confidence)
Provides the specific technical justification (cemented liner with wet shoe, frac-out capability) for granting the reduced 150' east boundary setback, directly conditioning the permit approval.
Page 1: STIPULATIONS - NDIC Field Order Info
Unknown (Missing confidence)
Explicitly ties permit approval to specific Commission Orders, indicating the permit is issued under the authority and conditions of those orders.
Page 2: Construction Commencement Notification
Unknown (Missing confidence)
A direct, non-routine regulatory stipulation requiring operator contact before construction, conditioning the post-approval execution of the permit.
Historical Context (2)
Alger-Bakken Unit formation definition and boundaries as the common source of supply, referencing a specific log from Erie #44-19H (File No. 17289) as the type log.
Page 1: STIPULATIONS - Conditions of Approval · Unknown
Defines the legal and geological unit boundaries and stratigraphic reference for all future operations, completions, and potential unit management within the Alger-Bakken Unit area.
Any changes, shortening of casing point or lengthening at Total Depth or change in completion technique within the Bakken-Three Forks Petroleum System must have prior approval by the NDIC.
Page 9: Operator Assertions · Unknown
Establishes a persistent, non-delegable regulatory requirement for NDIC pre-approval of any significant wellbore or completion design changes, affecting all future operations on this well.
Operator Pattern
Standardized APD submission with comprehensive anti-collision review, H2S planning, and adherence to established NDIC policies (e.g., closed mud system, filter sock container).
Operator assertions confirm review of wells within 500' for anti-collision, acknowledgment of H2S presence in Mission Canyon, and understanding of standard NDIC requirements like survey frequency and log submission.
Confidence: High
The permit document explicitly contains the approval conditions and justification (setbacks based on cemented liner/wet shoe, reference to Commission Orders) within the 'STIPULATIONS' section. Key dates (approval, submission) are provided in the document metadata.