← Back to Daily Permits
OTHER
Wellfile updated - +2 pages
First detected 2026-11-03 · was Oct 19, 2026 · +2 pages · Full diff →

Ross 116-0515H

EOG RESOURCES, INC. · Mountrail County, ND · File #43414 · Generated 2026-11-27 02:13

API
3306105727
Target Formation
Three Forks First Bench
Permit Explained
Yes

Permit Cycle Assessment

The permit contains contemporaneous explanation. Approval is explicitly granted pursuant to Commission Orders 35122 & 35123 and conditioned on specific Alger-Bakken Unit setbacks (500' south, 150' east). The 150' east setback is justified by a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.

Permit Cycle Signals (4)

Permit approval granted on the condition that all portions of the wellbore not isolated by cement be no closer than the 500' setback from the south boundary and 150' setback from the east boundary within the Alger-Bakken Unit.
Direct
Page 1: STIPULATIONS - NDIC Field Order Info
Unknown (Missing confidence)
This approval condition directly references specific, non-standard setback requirements (500' south, 150' east) within the Alger-Bakken Unit, which differentiate it from routine horizontal approvals and justify the permit geometry.
East setback of 150' is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Direct
Page 1: STIPULATIONS - NDIC Field Order Info
Unknown (Missing confidence)
Provides the specific technical justification (cemented liner with wet shoe, frac-out capability) for granting the reduced 150' east boundary setback, directly conditioning the permit approval.
Pursuant to Commission Order No. 35122 & 35123, approval to drill the well is hereby given.
Direct
Page 1: STIPULATIONS - NDIC Field Order Info
Unknown (Missing confidence)
Explicitly ties permit approval to specific Commission Orders, indicating the permit is issued under the authority and conditions of those orders.
EOG must contact NDIC Field Inspector Dylan Roach at 701-770-1981 prior to location construction.
Direct
Page 2: Construction Commencement Notification
Unknown (Missing confidence)
A direct, non-routine regulatory stipulation requiring operator contact before construction, conditioning the post-approval execution of the permit.

Historical Context (2)

Alger-Bakken Unit formation definition and boundaries as the common source of supply, referencing a specific log from Erie #44-19H (File No. 17289) as the type log.
Page 1: STIPULATIONS - Conditions of Approval · Unknown
Defines the legal and geological unit boundaries and stratigraphic reference for all future operations, completions, and potential unit management within the Alger-Bakken Unit area.
Any changes, shortening of casing point or lengthening at Total Depth or change in completion technique within the Bakken-Three Forks Petroleum System must have prior approval by the NDIC.
Page 9: Operator Assertions · Unknown
Establishes a persistent, non-delegable regulatory requirement for NDIC pre-approval of any significant wellbore or completion design changes, affecting all future operations on this well.

Operator Pattern

Standardized APD submission with comprehensive anti-collision review, H2S planning, and adherence to established NDIC policies (e.g., closed mud system, filter sock container).
Operator assertions confirm review of wells within 500' for anti-collision, acknowledgment of H2S presence in Mission Canyon, and understanding of standard NDIC requirements like survey frequency and log submission.
Confidence: High
The permit document explicitly contains the approval conditions and justification (setbacks based on cemented liner/wet shoe, reference to Commission Orders) within the 'STIPULATIONS' section. Key dates (approval, submission) are provided in the document metadata.