BULLDOG FED 35-26-23 3HF
Phoenix Operating LLC · McKenzie County, ND · File #43423 · Generated 2026-11-27 02:13
- API
- 3305310909
- Target Formation
- BAKKEN
- Permit Explained
- Yes
Permit Cycle Assessment
The permit's approval is directly explained by its conditional linkage to Commission Order 35181. Supporting pre-permit actions include a waiver request for off-spacing notification and final BLM coordination on the approval date.
Permit Cycle Signals (3)
Page 1, STIPULATIONS section
Relative (Inferred confidence)
The permit's approval is explicitly conditioned upon compliance with a specific Commission Order, making it the direct regulatory basis for issuance.
Email from Nathaniel Erbele dated 10/19/2026
2026-10-19 (Exact confidence)
This communication on the approval date indicates a final pre-approval compliance requirement tied to federal mineral ownership within the spacing unit.
Letter from Meaghan Coughlan, Phoenix Operating, dated April 7th, 2026
2026-04-07 (Exact confidence)
This is a pre-permit submission addressing a specific regulatory condition (notification for wells entering target zone outside spacing unit) required for approval.
Historical Context (2)
NDAC 43-02-03-19.2 requires a leak-proof, covered, placarded container for filter socks on-site from spud through flow-back, with waiver only via Sundry Notice.
Letter from Mark F. Bohrer, Assistant Director, dated July 29, 2026 · 2026-07-29
This is a persistent, non-routine waste disposal requirement that mandates specific on-site equipment and procedures for the entire drilling and completion phase.
The well design incorporates a wet shoe in the production liner with the ability to frac out the shoe, referenced in the north setback justification.
Page 1, STIPULATIONS section; Proposed Drilling Plan schematic · Unknown
This specific completion hardware choice (wet shoe) affects future fracture stimulation operations and is integral to the approved wellbore geometry and setback compliance.
Operator Pattern
Proactive submission of regulatory waiver requests and detailed directional plans ahead of permit application.
Submitted Backbuild Order Waiver (April 2026) and detailed directional survey/plan (Taktikal Directional, April 2026) prior to permit approval (Oct 2026).
Confidence: High
The permit document explicitly cites the governing Commission Order (35181) and contains direct, date-specific communications (BLM email) from the approval date. Supporting waiver request is clearly dated and relevant.