OTHER
Wellfile updated - +1 pages
BULLDOG FED 35-26-23 4HF
Phoenix Operating LLC · McKenzie County, ND · File #43424 · Generated 2026-11-27 02:13
- API
- 3305310910
- Target Formation
- Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit contains contemporaneous documentation explaining its approval. Direct signals include conditioning on Commission Order 35181, a spacing unit justification tied to another well's setbacks, a completion-design-based setback modification, and a same-day regulatory instruction regarding federal coordination.
Permit Cycle Signals (4)
Permit Information, Stipulations section
Unknown (Missing confidence)
The permit's approval is directly tied to a prior Commission Order, establishing the legal and geometric constraints for the wellbore.
Permit Information, Page 2
2026-10-19 (Exact confidence)
This is a specific, non-routine condition tied to the geometry of this permit, conditioning approval on the existence of another well with specific setbacks.
Permit Information, Stipulations section
2026-10-19 (Exact confidence)
Directly modifies the standard setback rule by linking it to a specific completion design (cemented liner with wet shoe), which is a technical justification for the approved geometry.
Email from Nathaniel Erbele, 10/19/2026 7:50 AM
2026-10-19 (Exact confidence)
A direct, time-sensitive regulatory instruction issued on the permit approval date, conditioning final execution on BLM coordination.
Historical Context (2)
Backbuild Order Waiver request (April 7, 2026) for wells entering the target spacing unit from outside, citing Order 31848 notification requirements and stating no adjacent operator exists.
Letter from Phoenix Operating to Todd Holweger, April 7, 2026 · 2026-04-07
Establishes a pre-existing regulatory acknowledgement and operational plan for drilling across unit boundaries, which affects execution and future regulatory compliance for the pad.
Directional survey and drilling plan (Plan #1, Rev 0) dated April 09, 2026, detailing trajectory, targets, and collision avoidance disclaimers.
Taktikal Directional Survey Report and Plan · 2026-04-09
The approved directional plan governs all subsequent drilling execution and collision avoidance protocols for this wellbore.
Operator Pattern
Proactive regulatory engagement for non-routine operations.
Submitted a Backbuild Order Waiver request in advance of permit application and utilized a detailed directional plan from a third-party vendor.
Confidence: High
The permit document contains explicit stipulations and conditions tied directly to the approval. Supporting documents like the waiver request and directional plan are dated and clearly relevant. Key dates are present in the permit and correspondence.