First detected 2026-11-02 · was Oct 21, 2026 · +2 pages · Full diff →

Liberty State 12-36H SWD

True Oil LLC · McKenzie County, ND · File #43430 · Generated 2026-11-27 02:13

API
3305310912
Target Formation
Dakota Group
Permit Explained
Yes

Permit Cycle Assessment

The permit approval is directly conditioned on UIC Order No. 36121, which authorizes the specific injection activity. Non-routine stipulations (pre-construction inspection, tank dike variance) and the completion of the public notice process further explain the permit's specific terms.

Permit Cycle Signals (5)

UIC Order No. 36121 authorizes the disposal of Class II fluids via injection into the Dakota Group through the Liberty State #12-36H SWD well.
Direct
ORDER NO. 36121
2026-10-13 (Exact confidence)
The order is the direct regulatory approval authorizing the specific injection activity for this SWD well.
Permit stipulation requires on-site inspection by NDIC Field Inspector William Ryan prior to location construction.
Direct
STIPULATIONS, Category: UIC Stipulation
2026-10-20 (Exact confidence)
A pre-construction inspection is a non-routine, regulator-imposed condition tied to the approval of this specific permit.
Permit includes a tank diking variance request approval contingent on submission of an as-built site schematic after construction.
Direct
STIPULATIONS, Stipulation
2026-10-20 (Exact confidence)
This is a waiver/modification of a standard regulation (NDAC 43-02-03-53.3(5)) specifically tied to the approved facility design.
Area of Review analysis identifies the 'Liberty Federal 13-36 36-31H TF1' well within 1/4 mile radius.
Supporting
AREA OF REVIEW, File Number: 23927
Unknown (Missing confidence)
Regulatory requirement to review nearby wells for the UIC permit. No corrective action indicated as 'None Needed'.
Public notice period for 'area of interest' was completed and comments were addressed in Order 36121.
Direct
ORDER NO. 36121, paragraphs (6)-(10)
2026-07-22 to 2026-08-26 (Inferred confidence)
The permit approval is conditioned on completing a regulatory public notice process and addressing agency comments.

Historical Context (2)

UIC Order No. 36121 remains in full force and effect until further order of the Commission.
ORDER NO. 36121, IT IS THEREFORE ORDERED: (3) · 2026-10-13
The underlying UIC order is a permanent authorization governing the well's injection operations beyond the drilling permit.
Permit stipulation: 'Unless the well is completed as Saltwater Disposal well by October 20, 2027, this permit shall expire.'
STIPULATIONS, Stipulation · 2026-10-20
This is a forward-looking, time-bound obligation requiring the operator to complete the well as an SWD within one year.

Operator Pattern

The operator utilizes a detailed, engineered approach for SWD well planning, evidenced by comprehensive drilling prognosis, directional design, cement programs, and BOP schematics.
The file includes extensive technical submissions: directional survey design with anticollision analysis, detailed casing and cementing programs, fracture analysis, BOP schematics, and a detailed completion procedure.
Confidence: High
The file contains the direct regulatory Order (36121) that authorizes the injection activity, the approved permit with specific stipulations, and all major supporting technical documents (AOR, public notice records, engineering plans) contemporaneous with the permit approval date.