← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
GARFIELD FEDERAL 5003 43-15 4B
WHITING OIL AND GAS CORPORATION (Chord Energy) · McKenzie County, ND · File #43432 · Generated 2026-11-27 02:13
- API
- 3305310913
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval is explicitly conditioned by Order 31756 and non-standard boundary setbacks tied to a wet shoe completion. Direct stipulations include pre-construction inspector contact, a perimeter berm, and lateral coordinate limits. Supporting anti-collision and drill-back waiver documentation justifies approval.
Permit Cycle Signals (5)
Permit Information - STIPULATIONS section
2026-10-22 (Exact confidence)
Non-standard setback (1220' east/west) tied to specific well geometry (wet shoe completion) and unit boundaries, conditioned by Order 31756.
Permit Information - Conditions of Approval section
2026-10-22 (Exact confidence)
Pre-construction contact requirement and specific berm stipulation conditioning permit approval.
Page 2 of 10
2026-10-22 (Exact confidence)
Specific directional survey constraints for this well's trajectory, defining legal limits tied to permit approval.
Permit Information - STIPULATIONS section (NDIC Field Order Info)
Unknown (Missing confidence)
The permit's authority is explicitly derived from this order, making it a foundational condition.
Operator Assertions section and referenced attachment "6 - Operator Drill Statements - Proposed Work Comments.pdf"
2026-10-08 (Inferred confidence)
Required technical submission justifying permit approval by demonstrating collision avoidance.
Historical Context (3)
The facility design uses an indirect heater with a setback exemption under NDIC Case No. 28949 Order No. 31500, allowing it to be set within 60 feet of the well head and 21 feet of the oil tank.
FACILITY STATEMENT (within referenced attachment) · Unknown
This existing variance governs facility placement on the pad for this and future wells, impacting pad layout and safety zone compliance.
Operator's drill-back policy waiver request (Oct 6, 2026) because Whiting is the operator of the adjacent spacing unit traversed by the wellbore.
Email correspondence from Melissa Szudera dated Tuesday, October 6, 2026 · 2026-10-06
Establishes the operator's sole control over the units penetrated, simplifying regulatory coordination and liability for future operations on this pad.
Federal minerals notification requirement from BLM for spacing unit Sections 3, 10, 15-T150N-R103W.
Email from Emma Neigum (NDIC) dated Thursday, October 22, 2026 11:09 AM · 2026-10-22
Confirms ongoing BLM oversight for federal minerals within the unit, requiring future coordination for drilling and completion activities.
Operator Pattern
Proactive regulatory engagement and use of technical waivers/exemptions.
Submitted drill-back policy waiver request pre-permit; utilizes pre-approved facility setback exemption (Order 31500); includes comprehensive anti-collision and technical statements.
Confidence: High
The permit document contains explicit, dated stipulations and references to orders that directly condition approval. Supporting technical submissions and correspondence are present and dated close to the permit approval date, providing clear contemporaneous explanation.