← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
First detected 2026-10-28 · was Oct 23, 2026 · +1 page · Full diff →

GARFIELD FEDERAL 5003 43-15 6B

Whiting Oil and Gas Corporation · McKenzie County, ND · File #43435 · Generated 2026-11-27 02:13

API
3305310916
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit approval is directly conditioned by Commission Order 31756 and a specific 'SPECIAL ATTENTION' stipulation requiring coordinated drilling with the GARFIELD FEDERAL 5003 43-15 3B. Technical justification for non-standard setbacks is provided based on a wet shoe completion design.

Permit Cycle Signals (4)

Pursuant to Commission Order No. 31756, approval to drill the well is hereby given. The approval is granted on the condition that all portions of the well bore not isolated by cement, be no closer than the 150' setback from the north & south boundaries and 500' setback from the east & west boundaries within the 1920-acre spacing unit consisting of Sections 3, 10, and 15, Township 150 North, Range 103 West.
Direct
PERMIT INFORMATION - NDIC Field Order Info
2026-10-23 (Exact confidence)
Conditional approval of permit explicitly tied to a specific Commission Order (31756) and unique spacing unit setbacks (150'/500') differentiating it from routine approvals.
The north setback is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Direct
PERMIT INFORMATION - NDIC Field Order Info
2026-10-23 (Exact confidence)
Provides specific technical justification (wet shoe completion design) for the unique north setback condition in the permit approval.
In order to justify the spacing unit Whiting must drill the GARFIELD FEDERAL 5003 43-15 3B back-to-back with another well that would comply with a 1220' setback.
Direct
PERMIT INFORMATION - SPECIAL ATTENTION Stipulation
2026-10-23 (Exact confidence)
Explicit regulatory stipulation tying approval of this permit (6B) to the simultaneous approval and drilling of a specific adjacent well (3B) to meet unit development requirements.
RE: Filter Socks and Other Filter Media Leak Proof Container Required
Supporting
Letter from NDIC dated July 29, 2026
2026-07-29 (Exact confidence)
Regulator-issued directive mandating specific on-site waste container practices, referenced within permit conditions, conditioning operational execution.

Historical Context (2)

Pursuant to Order No. 31848 DRILL-BACK POLICY FOR HORIZONTAL WELLS, notification to the adjacent operator is required... However, Whiting Oil & Gas Corporation is the operator of the adjacent spacing unit, therefore a waiver on said notification is requested.
Letter from Operator to NDIC dated October 6, 2026 · 2026-10-06
Establishes that the wellbore traverses an adjacent spacing unit, invoking a standing drill-back policy (Order 31848) and a company-wide waiver that remains relevant for future well planning and regulatory compliance on this unit.
The director shall have the authority to approve requests to consolidate production equipment at a central location.
PERMIT INFORMATION - CPF (Comingling of Production) · 2026-10-23
Explicitly reserves regulator authority for future comingling requests, affecting future facility modifications and production reporting for this well and pad.
Confidence: High
The permit document contains clear, dated, regulatory stipulations and conditions directly linked to the approval date. Supporting documents (operator letter, NDIC directive) are contemporaneous and referenced in the permit context.