Iverson Federal 5404 11-35 2B
Oasis Petroleum North America LLC · Williams County, ND · File #43437 · Generated 2026-11-27 02:13
- API
- 3310506923
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval is directly conditioned by Commission Order No. 35949 and specific regulatory stipulations (CBLs). The non-standard south setback is justified by the planned 'wet shoe' completion technique. Supporting drill-back notification demonstrates compliance with pre-permit requirements.
Permit Cycle Signals (4)
Page 2 of 11, NDIC Field Order Info
Unknown (Missing confidence)
This is a direct, order-based condition of approval, specifying non-standard setbacks that constrain the wellbore geometry.
Page 1 of 11, STIPULATIONS section
Unknown (Missing confidence)
This is a specific regulatory stipulation conditioning the approval, differentiating it from standard cement evaluation requirements.
Page 2 of 11, NDIC Field Order Info
Unknown (Missing confidence)
This directly explains a permit condition (south setback) by linking it to the specific planned 'wet shoe' completion technique detailed in the operator's submission.
Affidavit Affirming Drill-Back Notification
2026-10-14 (Exact confidence)
This is a supporting, pre-permit submission required for approval, demonstrating compliance with a specific commission order for wells entering adjacent spacing units.
Historical Context (2)
NDAC 43-02-03-28 hydraulic fracture stimulation notification requirement for operators of wells within 2,640 ft in the same/adjacent pool.
Page 1 of 11, STIPULATIONS section · Unknown
This is a persistent regulatory obligation that applies to future completion operations, requiring advance notice to nearby operators.
The wellbore enters the Bakken Petroleum System outside of its target spacing unit.
Affidavit Affirming Drill-Back Notification · 2026-10-14
This established geometry creates a persistent, defined obligation for notification and coordination with adjacent unit operators during drilling, as codified in Order No. 31848.
Operator Pattern
Utilizes 'wet shoe' completion technique to enable pump-down wireline perforation for toe initiation.
Documented in the operator's 'WetShoe Discussion' and referenced in the permit to justify the south setback condition.
Confidence: High
Key permit conditions (Order 35949, CBL stipulations) are explicitly stated. The 'wet shoe' justification for the south setback is directly linked between the operator's submission and the permit language. The drill-back affidavit is date-stamped and fulfills a clear pre-approval requirement.