← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
First detected 2026-11-06 · was Oct 29, 2026 · +1 page · Full diff →

STRANDED CAT 28-21-16-9 1H

DEVON ENERGY WILLISTON, L.L.C. · Williams County, ND · File #43440 · Generated 2026-11-27 02:13

API
3310506924
Target Formation
Bakken (Squires-Bakken Pool)
Permit Explained
Yes

Permit Cycle Assessment

The permit contains contemporaneous stipulations and conditions of approval that directly explain and constrain the permit issuance. These include specific setbacks tied to the well's geometry and completion design, a critical offset well proximity warning requiring frac precautions, and a construction notification requirement.

Permit Cycle Signals (3)

Approval conditioned on 150' north & south and 500' west boundary setbacks within the 2560-acre spacing unit, with north setback based on a production liner cemented in lateral with wet shoe and ability to frac out shoe.
Direct
Stipulations section, NDIC Field Order Info
2026-10-29 (Exact confidence)
Specific setback modification tied to well geometry and completion technique (wet shoe), not standard spacing.
Adjacent well Jorgenson 1-9 within 130 feet of proposed wellbore requires frac design precautions to avoid adverse effects.
Direct
Stipulations section, SPECIAL ATTENTION
2026-10-29 (Exact confidence)
Directly conditions permit approval on specific operational constraint due to wellbore proximity.
Notification to NDIC Field Inspector Jessica Gilkey required prior to location construction, and perimeter berm required.
Direct
Conditions of Approval
2026-10-29 (Exact confidence)
Specific inspector contact and berm requirement imposed as condition of approval.

Historical Context (2)

Devon's commitment to comply with NDIC Orders 31973 and 31848 regarding notification for wells entering adjacent spacing units.
Letter from Devon Energy dated September 2nd, 2026 · 2026-09-02
Establishes a forward operational protocol for all wells on this pad (1H-4H) regarding communication and planning when crossing unit boundaries, impacting future drilling and regulatory compliance.
Requirement for covered leak-proof container with placard for filter sock disposal from spud through flow-back.
Permit page 8 of 10, Operator assertions and NDIC letter dated July 29, 2026 · 2026-07-29
Imposes a persistent waste management obligation for the duration of drilling, completion, and flowback operations on this well and potentially others on the pad.

Operator Pattern

Proactive communication with regulator regarding pad-wide planning and cross-unit drilling notifications.
Submitted letter (Sept 2, 2026) addressing regulatory orders for all four wells on the pad (1H-4H) despite being operator of adjacent unit.
Confidence: High
The permit document contains explicit, dated stipulations and conditions of approval issued by the regulator that directly condition the permit's issuance. The document provides clear separation between permit-cycle requirements and supporting historical context.