← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
STRANDED CAT 28-21-16-9 1H
DEVON ENERGY WILLISTON, L.L.C. · Williams County, ND · File #43440 · Generated 2026-11-27 02:13
- API
- 3310506924
- Target Formation
- Bakken (Squires-Bakken Pool)
- Permit Explained
- Yes
Permit Cycle Assessment
The permit contains contemporaneous stipulations and conditions of approval that directly explain and constrain the permit issuance. These include specific setbacks tied to the well's geometry and completion design, a critical offset well proximity warning requiring frac precautions, and a construction notification requirement.
Permit Cycle Signals (3)
Stipulations section, NDIC Field Order Info
2026-10-29 (Exact confidence)
Specific setback modification tied to well geometry and completion technique (wet shoe), not standard spacing.
Stipulations section, SPECIAL ATTENTION
2026-10-29 (Exact confidence)
Directly conditions permit approval on specific operational constraint due to wellbore proximity.
Conditions of Approval
2026-10-29 (Exact confidence)
Specific inspector contact and berm requirement imposed as condition of approval.
Historical Context (2)
Devon's commitment to comply with NDIC Orders 31973 and 31848 regarding notification for wells entering adjacent spacing units.
Letter from Devon Energy dated September 2nd, 2026 · 2026-09-02
Establishes a forward operational protocol for all wells on this pad (1H-4H) regarding communication and planning when crossing unit boundaries, impacting future drilling and regulatory compliance.
Requirement for covered leak-proof container with placard for filter sock disposal from spud through flow-back.
Permit page 8 of 10, Operator assertions and NDIC letter dated July 29, 2026 · 2026-07-29
Imposes a persistent waste management obligation for the duration of drilling, completion, and flowback operations on this well and potentially others on the pad.
Operator Pattern
Proactive communication with regulator regarding pad-wide planning and cross-unit drilling notifications.
Submitted letter (Sept 2, 2026) addressing regulatory orders for all four wells on the pad (1H-4H) despite being operator of adjacent unit.
Confidence: High
The permit document contains explicit, dated stipulations and conditions of approval issued by the regulator that directly condition the permit's issuance. The document provides clear separation between permit-cycle requirements and supporting historical context.