← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
First detected 2026-11-06 · was Oct 29, 2026 · +1 page · Full diff →

STRANDED CAT 28-21-16-9 3H

DEVON ENERGY WILLISTON, L.L.C. · Williams County, ND · File #43442 · Generated 2026-11-27 02:13

API
3310506926
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit approval contains direct stipulations that explain the approval, including specific setbacks justified by well construction, a required pool definition, and a pre-construction notification requirement. A pre-permit letter addresses regulatory order requirements for wells exiting the spacing unit.

Permit Cycle Signals (4)

Approval condition stipulating 150' north & south setbacks and 500' east & west setbacks within the 2560-acre spacing unit, justified by production liner cemented lateral with wet shoe and ability to frac out shoe.
Direct
PERMIT INFORMATION - STIPULATIONS
2026-10-29 (Exact confidence)
Specific setback requirements tied to a unique well construction feature (wet shoe/liner cementing) rather than standard setbacks.
Definition of Squires-Bakken Pool from 50 feet above top of Bakken Formation to above top of Birdbear Formation.
Direct
PERMIT INFORMATION - Conditions of Approval
2026-10-29 (Exact confidence)
Regulatory pool definition required for permit approval, establishing legal parameters for the well.
Requirement for Devon to contact NDIC Field Inspector Jessica Gilkey prior to location construction.
Direct
PERMIT INFORMATION - Construction Commencement Notification
2026-10-29 (Exact confidence)
Specific, non-routine pre-construction notification requirement tied to a named inspector.
Notification to adjacent spacing unit operator per NDIC Orders 31973 and 31848, as Devon is the adjacent operator and self-notification is stated as sufficient.
Supporting
September 2nd, 2026 Letter
2026-09-02 (Exact confidence)
Pre-permit letter addressing specific regulatory order requirements for horizontal wells exiting the target spacing unit, justifying regulatory compliance.

Historical Context (3)

Waiver requirement for log acquisition: 'Request Waiver' noted for Acoustic/Sonic and other logs, requiring a separate sundry filing.
GEOLOGIC INFORMATION - PROPOSED LOGS · Unknown
Establishes a forward obligation to either acquire certain logs or formally request and justify a waiver via sundry notice, affecting post-permit operations and reporting.
Operator acknowledges requirement to contact NDIC for proper plug back procedures in event of a sidetrack.
PROPOSED WORK - OPERATOR ASSERTIONS · Unknown
Creates a binding operational constraint requiring regulatory engagement before executing a sidetrack, impacting future well intervention decisions.
Operator understands any changes to casing point, total depth, or completion technique within Bakken-Three Forks system require prior NDIC approval.
PROPOSED WORK - OPERATOR ASSERTIONS · Unknown
Imposes a strict, forward-looking regulatory control point on any design deviation, affecting operational flexibility.

Operator Pattern

Proactive regulatory compliance and communication, evidenced by self-notification for adjacent spacing unit traversal.
September 2nd, 2026 letter states 'Devon is the operator of such adjacent spacing unit; therefore, no additional notification is necessary,' indicating a pattern of identifying and addressing regulatory requirements ahead of permit approval.
Confidence: High
The document provides the permit approval page with clear, date-stamped stipulations. A pre-permit letter directly addresses a key regulatory requirement for the permit type. Text extraction, while containing some OCR inconsistencies in plat sheets, is sufficient for the required analysis in the key permit and correspondence sections.