OTHER
Wellfile updated - +1 pages
First detected 2026-11-06 · was Oct 29, 2026 · +1 page · Full diff →

STRANDED CAT 28-21-16-9 4H

DEVON ENERGY WILLISTON, L.L.C. · Williams County, ND · File #43443 · Generated 2026-11-27 02:13

API
3310506927
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit approval is explicitly conditioned upon and explained by Commission Order 36219, which dictates specific boundary setbacks. A technical justification (wet shoe design) is provided for the north setback condition. Additional time-bound administrative conditions are stipulated.

Permit Cycle Signals (3)

Permit approval is explicitly conditioned upon Commission Order No. 36219, which mandates a 150' setback from N/S boundaries and a 500' setback from the east boundary within the 2560-acre spacing unit.
Direct
Permit Information section, Stipulations - NDIC Field Order Info
Unknown (Missing confidence)
The permit's issuance is directly tied to and contingent upon compliance with a specific Commission Order governing geometry and setbacks.
The north setback is specifically justified by a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Direct
Permit Information section, Stipulations - NDIC Field Order Info
Relative (Inferred confidence)
Provides a technical justification (wet shoe completion design) for a non-routine setback condition tied to the permit's approval.
A Sundry Notice must be filed within 3 business days of spudding, including specific information. The mandatory 3-business-day waiting period after permit publication can be waived by the Director.
Direct
Page 2, Conditions of Approval
Unknown (Missing confidence)
These are non-boilerplate, time-bound administrative conditions directly attached to the permit's validity and commencement of operations.

Historical Context (2)

Per NDIC Orders 31973 and 31848, Devon must provide directional drilling/completion plans, start dates, and contact info to operators of adjacent spacing units when wellbores traverse outside the target unit.
Devon Energy letter dated September 2nd, 2026 · 2026-09-02
This regulatory obligation persists for any future wells drilled from this pad that enter adjacent spacing units, requiring notification and plan sharing.
The operator must not intentionally deviate in the surface casing portion of the hole.
Page 9, Operator Understands section · Unknown
This is a persistent, non-standard operational constraint that applies to all phases of drilling for this well, affecting wellbore placement and survey compliance.

Operator Pattern

Operator demonstrates proactive compliance with cross-unit notification requirements as evidenced by the September 2026 letter acknowledging Orders 31973 and 31848.
Devon Energy letter dated September 2nd, 2026, stating that because Devon is the operator of the adjacent unit, 'no additional notification is necessary,' showing awareness and application of the rule.
Confidence: High
The permit document contains explicit, direct regulatory conditions (Order 36219) that justify the approval. The provided well file includes contemporaneous technical and regulatory correspondence that clarifies these conditions.