ALE 2335-2BHN

KODA Resources Operating, LLC · Divide County, ND · File #43444 · Generated 2026-11-27 02:13

API
3302301915
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit approval is directly explained by Commission Order 34629 (setback requirements), a site-specific aquifer stipulation requiring inspector approval, and a granted waiver for the three-day operational waiting period.

Permit Cycle Signals (3)

Commission Order No. 34629 conditions approval on a 150' setback from north & south boundaries and 500' from east & west boundaries within the 3840-acre spacing unit.
Direct
PERMIT INFORMATION, STIPULATIONS section
Unknown (Missing confidence)
This order is the explicit regulatory basis for permit approval and defines specific geometric constraints for the wellbore.
On-site inspection required and site-specific stipulations mandated because the well pad is located on an aquifer.
Direct
PERMIT INFORMATION, SPECIAL ATTENTION stipulation
Unknown (Missing confidence)
Directly conditions permit approval on compliance with additional, inspector-determined stipulations (closed mud system, impermeable liner) due to aquifer location.
Waiver granted for the three-day waiting period between permit publication and commencement of operations.
Direct
PERMIT INFORMATION, Conditions of Approval
Unknown (Inferred confidence)
This waiver, based on a supplied affidavit, modifies a standard permit condition and directly enables earlier operations.

Historical Context (2)

The operator is required to provide notice for hydraulic fracture stimulation to operators of wells completed in the same or adjacent pool within 2640 feet.
OPERATOR ASSERTIONS section · Unknown
This is a persistent regulatory obligation that conditions future completion operations, not just drilling.
The well is located off-spacing, requiring a surface use agreement affidavit.
OPERATOR ASSERTIONS section · 2025-12-18
The executed surface use agreement is a binding, long-term obligation that governs surface operations beyond this permit cycle.

Operator Pattern

Pad development across multiple drilling and spacing units.
Affidavit references an eight-well pad developing two separate DSUs (3840-acre and 2880-acre).
Confidence: High
The permit document contains explicit, contemporaneous regulatory orders and conditions (Order 34629, aquifer stipulation, waiver) that directly justify the permit approval. Historical signals are clearly separated.