← Back to Daily Permits
OTHER
Wellfile updated - +2 pages
First detected 2026-11-23 · was Nov 13, 2026 · +2 pages · Full diff →

DAVIDSON-23-11 N514H

FORMENTERA OPERATIONS, LLC · Burke County, ND · File #43445 · Generated 2026-11-27 02:13

API
3301302091
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit is directly conditioned on Commission Order 35715, with a specific setback waiver justified by a cemented liner with a wet shoe. The operator's drilling plan and a waiver request for adjacent unit notification are contemporaneous supporting documents.

Permit Cycle Signals (4)

Approval condition per Commission Order No. 35715 with specific setbacks: 150' from north & south boundaries, 500' from east & west boundaries within the 1920-acre unit.
Direct
Page 1, Stipulations section, NDIC Field Order Info
Relative (Inferred confidence)
The permit is explicitly granted conditional upon compliance with this specific order and its non-standard setback requirements tied to the well geometry.
Justification for north setback reduction to 150' based on a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe.
Direct
Page 1, Stipulations section, second NDIC Field Order Info
Relative (Inferred confidence)
Provides a direct technical justification for a waiver/modification of standard setback rules, conditioning the permit approval.
Completion notes specify liner shoe will be cemented ≥150' from section line, utilizing a wet shoe to facilitate pumping first-stage perforating guns.
Supporting
Preliminary Drilling Program section, Completion Notes
Unknown (Missing confidence)
Provides the technical execution plan that satisfies the regulator's condition for the reduced north setback.
Operator requests waiver from providing affidavit for NDIC Orders 31973 & 31848 (directional plan to adjacent unit) as they are the operator of the adjacent unit.
Supporting
Letter from Laura Erichsen dated October 22, 2026
2026-10-22 (Exact confidence)
Addresses a specific regulatory requirement for wells entering the spacing unit from outside, directly tied to permit conditions.

Historical Context (2)

Ongoing obligation to notify offset operators of Bakken/Madison wells within 2640' of the proposed wellbore prior to stimulation operations.
Wellbore Collision Prevention and Completion Stimulation Mitigation section · Unknown
Creates a forward operational constraint for the completion phase, requiring specific notice to neighboring operators.
Permanent requirement for closed mud system with hauling of cuttings to approved disposal site (Prairie Disposal, Inc.).
Preliminary Drilling Program, Closed Loop Drilling System description · Unknown
Defines the waste handling method for the entire drilling operation, affecting logistics and site planning.

Operator Pattern

Proactive waiver and compliance documentation: seeks waivers for filter sock container (no filtration planned) and open-hole logs (using offset data), and pre-emptively addresses regulatory orders.
Letters and notes detail plans to submit sundry notices for waivers, request affidavit waiver for Orders 31973/31848, and declare no diesel use in frac.
Confidence: High
The permit stipulations directly reference Order 35715 and provide a technical justification for the setback condition. Multiple operator-submitted documents (drilling plan, waiver letters) are clearly time-bound to the application and address specific regulatory requirements.