← Back to Daily Permits
OTHER
Wellfile updated - +2 pages
First detected 2026-11-23 · was Nov 13, 2026 · +2 pages · Full diff →

LAR1-23-02 S516H

FORMENTERA OPERATIONS, LLC · Burke County, ND · File #43446 · Generated 2026-11-27 02:13

API
3301302092
Target Formation
Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit package contains contemporaneous documentation that explains and justifies the permit approval. This includes the stipulation directly conditioning approval on Order 35715, along with supporting technical and legal submissions (anticollision report, off-spacing affidavit, regulatory waiver request) that address specific, non-routine requirements for this well's geometry and location.

Permit Cycle Signals (4)

Permit approval conditioned on wellbore setbacks defined in Commission Order No. 35715 for a 1920-acre spacing unit. Specific approval for a reduced 150' south setback granted due to production liner cemented in lateral with a wet shoe.
Direct
Permit Information page, STIPULATIONS section
Relative (Inferred confidence)
Directly cites the regulatory order that grants approval and provides a specific technical justification (cemented liner with wet shoe) for a reduced setback, differentiating it from standard conditions.
Directional plan and anticollision analysis submitted, identifying nearest approach of 4.45 ft at 104.45 MD to offset well AV-IVERSON-162-94-2314H-1.
Supporting
Anticollision Report, Summary Highlights
2026-10-21 (Exact confidence)
Technical submission demonstrating wellbore collision prevention, a pre-requisite for permit approval. Directly addresses anticollision concerns raised in operator assertions.
Off-spacing affidavit submitted, confirming executed Surface Use Agreement with surface owner for off-spacing surface location.
Supporting
OFF-SPACING AFFIDAVIT
2026-10-22 (Exact confidence)
Required legal document for approval of a well drilled from a surface location outside its target spacing unit. Directly addresses a specific, non-routine condition of the permit.
Operator waives requirement to provide affidavit per NDIC Orders 31973/31848 to adjacent unit operator, as they are the operator of the adjacent unit.
Supporting
Letter following Best Management Practices, paragraph 2
2026-10-22 (Exact confidence)
Addresses a specific regulatory requirement tied to drilling through an adjacent spacing unit. The waiver request is a non-routine action directly conditioning permit approval.

Historical Context (3)

Mandatory automatic and remote shutoff devices (SCADA) on all equipment, including tank level switches, pipeline flow meters, and thermal cameras, with defined alarm triggers.
Permit Review Policy; Best Management Practices Letter; Spill Prevention and Spill Response Plan · Unknown
Imposes a persistent operational control and monitoring obligation for the life of the well. Failure to maintain these systems constitutes a regulatory violation.
Requirement to run specific logs (casing evaluation, cement evaluation, gamma ray) and submission of waiver requests for density/porosity and resistivity logs, referencing a specific offset well for geologic control.
GEOLOGIC INFORMATION - PROPOSED LOGS; Preliminary Drilling Program - Open-Hole Log Waiver section · Unknown
Creates a binding logging program and sets a precedent for future waiver requests based on specific offset data. Obligates the operator to submit the waived sundry notices post-approval.
Stipulation to contact NDIC Field Inspector Jason Hicks prior to location construction and to notify upon spudding.
Permit Information page, 'Construction Commencement Notification' and 'It is requested...' paragraphs · Unknown
These are pre-spud operational conditions that must be fulfilled before drilling can commence, creating immediate, time-sensitive obligations upon permit approval.

Operator Pattern

Proactive submission of waivers and mitigation plans for standard requirements (filter sock container, open-hole logs) alongside comprehensive engineering and regulatory packages.
Includes waiver declarations for filter sock container and open-hole logs within drilling program; submits detailed anticollision, spill response, and best management practices plans; provides affidavit and regulatory waiver requests for off-spacing and adjacent unit notification.
Confidence: High
The permit document explicitly cites the governing order (35715) and provides a technical justification for a reduced setback. Supporting submissions (anticollision, affidavit, waiver letters) are contemporaneous with the application date (Oct 2026) and directly address permit conditions or operator assertions. Key dates are present in the documentation.