← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
First detected 2026-11-11 · was Nov 3, 2026 · +1 page · Full diff →

ALE 1534-5BH

KODA RESOURCES OPERATING, LLC · Divide County, ND · File #43447 · Generated 2026-11-27 02:13

API
3302301916
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit approval is directly conditioned by Order 35874, specific geometric constraints for the lateral, a requirement for a companion well to satisfy spacing, and aquifer-based site stipulations.

Permit Cycle Signals (4)

Pursuant to Commission Order No. 35874, approval to drill is granted on the condition that all portions of the well bore not isolated by cement be no closer than the 150' setback from the north & south boundaries and 500' setback from the east & west boundaries within the 2880-acre spacing unit.
Direct
Permit Information - NDIC Field Order Info
Unknown (Missing confidence)
This is a direct regulatory order conditioning the permit approval with specific geometric constraints tied to the spacing unit.
Based on the azimuth of the proposed lateral, the minimum legal coordinate from the well head at 7" casing point is: 906' south. Also, based on the azimuth of the proposed lateral the maximum legal coordinates from the well head at Total Depth are: 16493' south and 2198' west.
Direct
Permit Information - Conditions of Approval (Page 2)
2026-11-03 (Exact confidence)
This condition defines specific, non-standard geometric constraints for the lateral trajectory, justifying the permit's approval for this specific well path.
In order to justify the spacing unit, this well must be drilled in conjunction with a well that meets a 1220' setback from the east and west spacing unit boundaries.
Direct
Permit Information - Conditions of Approval (Page 3)
2026-11-03 (Exact confidence)
This condition directly ties the permit approval to the drilling of another well with specific boundary setbacks, justifying the permit for this unit.
Due to the fact that this well is located on an aquifer an onsite inspection is required...Closed Mud System with no drilling pit, and impermeable liner is required on the entire location.
Direct
Permit Information - SPECIAL ATTENTION
2026-11-03 (Exact confidence)
This is a direct, site-specific stipulation justifying permit approval based on environmental risk (aquifer) and mandating non-routine operational conditions.

Historical Context (2)

The liner will be fully cemented using a wet shoe with the ability to frac out the toe.
KODA Resources, LLC DRILLING PLAN (Completion Program section) · Unknown
This is a persistent operational constraint for the well's completion design that must be executed and verified post-permit.
KODA Resources will be submitting a sundry to waive open hole logs.
KODA Resources, LLC DRILLING PLAN (Evaluation Program section) · Unknown
This is a forward-looking obligation requiring regulatory approval via a Sundry Notice after the permit is issued.

Operator Pattern

Pad-based development with multi-well planning, using surface use agreements for off-spacing and coordinated notifications/waivers for adjacent unit operations.
Affidavit of Surface Use Agreement and letter requesting waiver from Order 31973 for adjacent unit notification demonstrate a pattern of structured pad development and regulatory engagement.
Confidence: High
The document contains explicit, regulator-issued conditions of approval directly tied to the permit date. Key dates (permit approval, submission) are present. Suppression rules were applied to exclude routine boilerplate.