First detected 2026-11-11 · was Nov 5, 2026 · +1 page · Full diff →

ALE 1534-3BHN

KODA Resources Operating, LLC · Divide County, ND · File #43453 · Generated 2026-11-27 02:13

API
3302301922
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit is explained. The approval is conditioned by Commission Order No. 35873 and aquifer-related stipulations, and contemporaneous operator and directional documents support the wet-shoe completion, closed-loop drilling, and wellbore geometry relied on in the approval.

Permit Cycle Signals (4)

Commission Order No. 35873 grants approval subject to 150-foot north/south and 500-foot east/west setbacks within the 3840-acre spacing unit, and expressly ties the north setback to a production liner cemented in the lateral with a wet shoe and frac-out ability.
Direct
NDIC permit information, Stipulations / NDIC Field Order Info
2026-11-04 (Exact confidence)
This is a regulator-issued condition that directly explains the permit approval and makes the setback specific to the lateral completion design rather than routine spacing.
NDIC identifies an aquifer at the surface location and requires onsite inspection by the Field Inspector, a closed mud system with no drilling pit, and an impermeable liner over the entire location.
Direct
NDIC permit information, Stipulations / Special Attention
2026-11-04 (Exact confidence)
The aquifer condition changes the routine containment posture for approval and supports enhanced site protection requirements.
Operator drilling plan describes a fully cemented 4-1/2-inch production liner with a wet shoe and ability to frac out the toe, plus a closed-loop drilling system with cuttings containers and offsite disposal.
Supporting
Koda Resources Drilling Plan, Completion Program and Drilling Fluids / Cuttings sections
2026-09-30 (Inferred confidence)
It provides the contemporaneous technical basis for the wet-shoe setback condition and the aquifer closed-system requirement.
KLX Directional Well Planning Report provides the planned surface hole, kick-off, 7-inch casing point, and total-depth coordinates for Ale 1534-3BHN, supporting the permit's maximum legal coordinate and casing-point constraints.
Supporting
KLX Directional Well Planning Report for Ale 1534-3BHN
2026-08-06 (Exact confidence)
The report establishes the wellbore geometry relied upon by the approval and ties the permit conditions to the specific horizontal design.

Historical Context (3)

KODA Resources Operating requested a waiver from NDIC Order No. 31973 because it is the operator of the adjacent 2880-acre spacing unit that the pad wells may enter.
KODA Resources letter requesting waiver from NDIC Order 31973 and notary block · 2026-09-21
If the waiver is not granted or fully accepted, adjacent-spacing-unit notification and document-provision obligations can continue to affect future operations, completion planning, and inter-unit coordination.
A surface use agreement with Jerry and Cecilia Raaum is effective October 14, 2025, covering the Ale 15 pad wells, including this well.
Affidavit of Surface Use Agreement and notary block · 2025-10-14
The agreement establishes continuing surface access and damage-liability obligations that can affect pad construction, well operations, and production activities beyond permit issuance.
Operator acknowledged the hydraulic fracture notice requirement requiring prior written notice, 21 to 31 days before stimulation, to any operator of a well completed in the same or adjacent pool if completion intervals are within 2,640 feet.
NDIC permit information, Operator Assertions · 2026-11-04
The obligation persists beyond permit issuance and can affect completion scheduling, inter-operator coordination, and frac execution for this well and adjacent wells.

Operator Pattern

KODA Resources Operating is developing the ALE 15 pad as a multi-well facility across adjacent spacing units and has assembled pre-approval documentation for surface access, unit ownership, and regulatory accommodation of adjacent-unit operator requirements.