OTHER
Wellfile updated - +1 pages
First detected 2026-11-11 · was Nov 5, 2026 · +1 page · Full diff →

ALE 1535-4BHN

KODA Resources Operating, LLC · Divide County, ND · File #43454 · Generated 2026-11-27 02:13

API
3302301923
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The well file contains contemporaneous documentation that directly explains and conditions the November 4, 2026 permit approval. The permit action is justified by aquifer-related inspection and containment requirements, a non-routine setback condition tied to a cemented wet-shoe production liner and frac-out ability, azimuth-based legal coordinate limits, and shallow groundwater protection requirements.

Permit Cycle Signals (4)

Approval is conditioned on an aquifer-related onsite inspection by the NDIC Field Inspector, with possible site-specific stipulations including a closed mud system with no drilling pit and an impermeable liner across the entire location.
Direct
Page 1, Stipulations — SPECIAL ATTENTION
2026-11-04 (Exact confidence)
Aquifer proximity makes this a non-routine approval condition and directly ties the permit action to groundwater protection and site-specific containment.
Pursuant to Commission Order No. 35873, approval is granted only if wellbore portions not isolated by cement remain within 150-foot north and south setbacks and 500-foot east and west setbacks within the 3840-acre spacing unit; the north setback is expressly based on the production liner being cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Direct
Page 1, NDIC Field Order Info — Commission Order No. 35873
2026-11-04 (Exact confidence)
This condition is not generic setback language; it directly explains why the well's completion construction method was acceptable under the approved geometry.
Based on the proposed lateral azimuth, the maximum legal coordinate from the well head is limited to 406 feet south at the 7-inch casing point and 20,447 feet north at Total Depth.
Direct
Page 2, Conditions of Approval — maximum legal coordinate
2026-11-04 (Exact confidence)
The approval is conditioned on a specific directional geometry and coordinate limit, showing the permit was justified by the proposed cross-section lateral path rather than routine well placement.
To protect near-surface groundwater, any conductor, rat, or mouse hole must be cased and cemented to ground level, secured when not in use, and all rat and mouse holes must be plugged with cement and cut at least 4 feet below final grade within a reasonable timeframe after rig operations.
Direct
Page 2, Conditions of Approval — near surface groundwater protection
2026-11-04 (Exact confidence)
This condition adds non-routine near-surface wellbore construction and abandonment obligations consistent with the aquifer designation and differentiates the permit from routine horizontal approvals.

Historical Context (2)

KODA Resources Operating, LLC and surface owner Jerry and Cecilia Raum have an executed surface use agreement dated effective October 14, 2025 covering operations associated with the wells.
Affidavit of Surface Use Agreement · 2025-10-14
It establishes continuing surface access, indemnity, and damage-resolution obligations that affect this and future operations on the Ale 15 pad.
The working-interest affidavit states that KODA holds 77.46% working interest in the 3840-acre drilling and spacing unit associated with the Ale 1534/1535 wells and 83.75% working interest in an adjacent 2880-acre drilling and spacing unit.
Affidavit of Working Interest · 2026-09-21
Unit-level ownership interests may affect consent, allocation, and future directional drilling or spacing decisions connected to this pad and nearby wells.

Operator Pattern

The operator uses multi-well Bakken pads and directional laterals across section boundaries, and it has documented unit interests across adjacent drilling and spacing units.
The file includes a multi-well pad plan, a working-interest affidavit for the 3840-acre and adjacent 2880-acre units, and directional well planning materials for laterals extending across sections.
Confidence: Medium
The approval date and key permit-cycle stipulations are explicit and directly tied to the permit action. Confidence is reduced by incomplete operator-assertion answers, imperfect OCR formatting, and ancillary pre-permit materials that are not clearly referenced by the permit.