OTHER
Wellfile updated - +2 pages
Cottonwood 15-3421H
EOG Resources, Inc. · Mountrail County, ND · File #43471 · Generated 2026-11-27 02:13
- API
- 3306105729
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The new permit approval is explained by regulator-issued stipulations tying it to Alger-Bakken Unit orders, unit setbacks, the wet-shoe liner and frac-out shoe design, and a maximum legal coordinate at total depth. A dated pre-approval federal-minerals email adds a contemporaneous approval-cycle dependency on BLM coordination.
Permit Cycle Signals (4)
Page 1, Stipulations / NDIC Field Order Info and Conditions of Approval
2026-11-10 (Exact confidence)
It makes the Commission unit orders the legal basis for the permit and imposes non-routine unit boundaries and cement-isolation setbacks.
Page 1, NDIC Field Order Info stipulation; APD directional/cementing page notes 'Cemented Liner w/ wet shoe at TD' and 'EOG Resources, Inc. respectfully requests permission to frac out the toe.'
2026-11-10 (Exact confidence)
The approval condition is tied to a specific completion and wellbore-isolation method rather than routine horizontal-well setback language.
Page 2, Conditions of Approval
2026-11-10 (Exact confidence)
It converts rectangular coordinate verification into a binding permit-specific directional constraint for this well path.
Outlook email from Doug Jackson, NDIC, dated 11/5/2026
2026-11-05 (Exact confidence)
It is a contemporaneous regulatory communication that identifies a federal-minerals dependency directly relevant to the approval cycle.
Historical Context (4)
EOG filed an affidavit stating that diesel fuel will not be used in hydraulic fracturing fluids for the six subject wells, including Cottonwood 15-3421H.
AFFIDAVIT IN RE HYDRAULIC FRACTURE FLUIDS AS TO THE PROPOSED COTTONWOOD WELLS · 2026-09-28
This constrains future frac-fluid selection for the pad completions and can be tested against later operations; changing to diesel use would require separate regulatory attention.
NDIC requires a covered leak-proof placarded container for filter socks and other filter media beginning when the well is spud and remaining on site during cleanout, completion, and flow-back whenever filtration operations are conducted.
July 29, 2026 NDIC Letter, 'Filter Socks and Other Filter Media Leak Proof Container Required' · 2026-07-29
The obligation persists through spud, completion, and flow-back, and non-compliance would affect future field execution and waste disposal.
Any changes to casing point, total depth, or completion technique within the Bakken-Three Forks Petroleum System require prior NDIC approval.
Page 9, Operator Understandings · 2026-11-10
This creates a continuing regulatory gate for drilling or completion deviations after the permit is issued and can delay or condition field changes.
The permit requires porosity and resistivity logs unless otherwise approved by the Director, and the APD also lists a Density/Porosity waiver request.
Page 3, PROPOSED LOGS; Page 10, Operator Understandings · 2026-11-10
Logging obligations remain relevant for future operations and any unresolved waiver could affect evaluation work and data submission requirements.
Operator Pattern
EOG coordinates pad-level directional completions with wet-shoe liner design, pre-submitted frac-fluid attestations, and regulatory outreach on federal minerals.
APD liner/frac-out notes, multi-well pad layout, diesel no-use affidavit, and 11/5/2026 NDIC/BLM email.
Confidence: High
The file contains the approval date, API, file number, operator, explicit NDIC stipulations, Commission order references, and a dated pre-approval federal-minerals email that directly condition or explain the permit action.