Lovegood Federal 4595 42-19 2BX
Oasis Petroleum North America, LLC (Chord Energy subsidiary) · Dunn County, ND · File #43477 · Generated 2026-11-27 02:13
- API
- 3302505260
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The file contains contemporaneous permit-cycle documentation for the 2026-11-10 approval. The approved permit itself imposes direct stipulations tied to the 5120-acre spacing unit, a north-south drilling corridor, a south setback dependent on a wet-shoe liner and frac-out ability, and a same-date federal-minerals notice. Operator filings support the approval by addressing off-spacing surface-use coverage and adjacent-operator notification for the Bakken-Three Forks system. The 2026-11-16 core and sample letter is post-anchor and is not used as an explanation for the permit approval.
Permit Cycle Signals (5)
Permit Information, Stipulations section, pages 1-2 of 10, file 43477, API 3302505260
2026-11-10 (Exact confidence)
The condition ties the permit to a defined multi-section spacing unit and directional corridor rather than to routine pad geometry, and it controls the un-cemented well path target.
Permit Information, Stipulations section, page 2 of 10, file 43477, API 3302505260
2026-11-10 (Exact confidence)
It makes a completion technique part of the boundary justification for the permit and creates a technical condition tied to wellbore geometry and frac-out performance.
Outlook sent email from Nathaniel Erbele to Ryan Emery and BLM addresses dated 11/10/2026
2026-11-10 (Exact confidence)
It is a contemporaneous regulator-issued notice that identifies a non-routine federal-minerals constraint attached to the permit approval.
September 2nd, 2026 letter to North Dakota Industrial Commission, Lovegood Federal 4595 42-19 #2BX-#5B
2026-09-02 (Exact confidence)
It is a permit-cycle submission addressing a regulatory notice requirement for off-spacing wellbore entry and supports approval without additional adjacent-operator notice.
AFFIDAVIT AFFIRMING SURFACE USE AGREEMENT dated August 25, 2026
2026-08-25 (Exact confidence)
It satisfies the off-spacing surface-agreement condition tied to the permit application and explains how the operator addresses legal surface coverage for the pad and well paths.
Historical Context (1)
The facility statement identifies an indirect heater in lieu of a heated treater and states that the indirect heater has a setback exemption from the NDIC under Case No. 28949 / Order No. 31500, allowing placement within 60 feet of the well head and 21 feet of the oil tank.
Facility Statement, operator attachment following survey and directional materials · Unknown
Future construction, facility placement, or modifications must rely on or replace this reduced setback authorization, so it remains an operational constraint on the production layout.
Operator Pattern
Oasis, a Chord Energy subsidiary, is developing a multiwell pad whose horizontal wells enter adjacent or off-lease spacing units and is relying on surface use agreements and regulatory waivers to justify common-source-pad development.
The August 25, 2026 affidavit lists Lovegood Federal 2BX, 3B, 4B, and 5B wells drilled into off-lease units from the Section 19 pad, and the September 2, 2026 operator letter states that Oasis is also the operator of the adjacent spacing unit.
Confidence: High
The permit approval date, stipulations, operator waiver request, affidavit, and federal-minerals email are explicitly dated and legible enough to separate permit-cycle analysis from historical constraints. Some survey-plat dates are old or inconsistent, but they do not affect the primary permit-cycle determination.