OTHER
Wellfile updated - +3 pages
First detected 2026-11-26 · was Nov 20, 2026 · +3 pages · Full diff →

Potter 4595 33-29 2BX

Oasis Petroleum North America LLC · Dunn County, ND · File #43480 · Generated 2026-11-27 02:13

API
3302505261
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit file contains contemporaneous permit-cycle documentation that explains the 2026-11-12 approval. The approval is conditioned by an aquifer-driven site inspection and containment requirement, by Commission Order No. 35946 wellbore-position conditions tied to the 500-foot corridor and 150-foot setbacks, and by a wet-shoe lateral design that justifies those conditions. A separate operator submission addresses an adjacent-spacing unit notification waiver for the Bakken entry outside the target unit. Routine permit boilerplate and post-permit sample or waste requirements are not treated as explanations of the approval.

Permit Cycle Signals (4)

The permit stipulation states that because the well is located on an aquifer, an onsite inspection is required and the Field Inspector may require a closed mud system with no drilling pit and an impermeable liner over the entire location, with additional site-specific stipulations possible.
Direct
NDIC Permit Information, Page 2 of 10, STIPULATIONS - SPECIAL ATTENTION
2026-11-12 (Exact confidence)
This is a regulator-issued, well-specific condition directly conditioning the approval. The file also contains an operator assertion that the pad is not on an aquifer, creating a conflict but still showing a non-routine environmental control tied to the permit action.
Commission Order No. 35946 grants approval on the condition that all portions of the wellbore not isolated by cement remain approximately down the north-south axis within the 500-foot drilling corridor and no closer than the 150-foot setback from the north and south boundaries of the 3840-acre spacing unit.
Direct
NDIC Permit Information, Page 2 of 10, NDIC Field Order Info
2026-11-12 (Exact confidence)
This directly conditions approval on a specific lateral path and unit boundary geometry. The order expressly ties the north setback to the production liner being cemented in the lateral with a wet shoe and the ability to frac out the shoe.
The technical proposal describes a wet-shoe liner configuration in which cement is over-displaced by about 7 barrels to create approximately 400 feet of uncemented annulus around the toe, enabling first-stage perforating guns to be pumped down on wireline.
Supporting
Operator proposal, Full Well Diagram and WetShoe configuration; directional/technical proposal materials
2026-09-02 (Inferred confidence)
This supporting submission explains the completion design that makes the regulator’s cement-isolation and setback condition meaningful. It justifies why the permit language focuses on the wet shoe and frac-out capability rather than a fully cemented liner.
The operator requested a waiver of adjacent-operator notification under Order No. 31848 because the proposed wellbore enters the Bakken outside the target spacing unit and the operator is also the operator of the adjacent spacing unit.
Supporting
Operator sundry/letter dated September 2, 2026, RE: Potter wells adjacent operator notification waiver
2026-09-02 (Exact confidence)
This addresses a non-routine unit-crossing condition in the approval context. The waiver request supports why the permit could be approved despite the proposed wellbore extending outside the target spacing unit.

Historical Context (2)

The State Geologist letter requires all cores, core chips, and samples to be preserved, labeled, boxed, and shipped to the state core library, with samples due within 30 days of completion of drilling operations and cores due within 180 days unless a Form 4 sundry extension is approved.
ND Mineral Resources letter dated November 16, 2026, RE: CORES AND SAMPLES · 2026-11-16
This obligation persists after permit approval and controls drilling-fluid sampling, core handling, filing, and post-completion geologic reporting. Failure creates day-by-day civil penalty exposure and can affect later operations or filings.
The permit states that any change, including shortening of the casing point, lengthening at total depth, or change in completion technique within the Bakken-Three Forks petroleum system, must have prior approval by the NDIC.
NDIC Permit Information, Page 9 of 10, Operator understandings · 2026-11-12
This condition continues beyond permit issuance and governs execution if the well reaches a different casing point, total depth, or completion method. It constrains operational decisions during drilling and completion.

Operator Pattern

Oasis/Chord paired well-specific technical proposals with regulatory waiver requests, including wet-shoe lateral completion and adjacent-spacing notification waiver, while also seeking logging waivers.
The wet-shoe description, the September 2, 2026 Order 31848 notification waiver letter, and the request or waiver language for porosity and resistivity logs in the evaluation program and permit pages.
Confidence: Medium
The approval date and key regulator conditions are explicitly dated, but OCR-imperfect text and internal conflicts—particularly between the aquifer stipulation and the operator’s no-aquifer assertion, and between the permit’s in-unit boundary language and the outside-unit notification waiver—reduce certainty about the full regulatory basis.