OTHER
Wellfile updated - +3 pages
Potter 4595 33-29 2BX
Oasis Petroleum North America LLC · Dunn County, ND · File #43480 · Generated 2026-11-27 02:13
- API
- 3302505261
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit file contains contemporaneous permit-cycle documentation that explains the 2026-11-12 approval. The approval is conditioned by an aquifer-driven site inspection and containment requirement, by Commission Order No. 35946 wellbore-position conditions tied to the 500-foot corridor and 150-foot setbacks, and by a wet-shoe lateral design that justifies those conditions. A separate operator submission addresses an adjacent-spacing unit notification waiver for the Bakken entry outside the target unit. Routine permit boilerplate and post-permit sample or waste requirements are not treated as explanations of the approval.
Permit Cycle Signals (4)
NDIC Permit Information, Page 2 of 10, STIPULATIONS - SPECIAL ATTENTION
2026-11-12 (Exact confidence)
This is a regulator-issued, well-specific condition directly conditioning the approval. The file also contains an operator assertion that the pad is not on an aquifer, creating a conflict but still showing a non-routine environmental control tied to the permit action.
NDIC Permit Information, Page 2 of 10, NDIC Field Order Info
2026-11-12 (Exact confidence)
This directly conditions approval on a specific lateral path and unit boundary geometry. The order expressly ties the north setback to the production liner being cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Operator proposal, Full Well Diagram and WetShoe configuration; directional/technical proposal materials
2026-09-02 (Inferred confidence)
This supporting submission explains the completion design that makes the regulator’s cement-isolation and setback condition meaningful. It justifies why the permit language focuses on the wet shoe and frac-out capability rather than a fully cemented liner.
Operator sundry/letter dated September 2, 2026, RE: Potter wells adjacent operator notification waiver
2026-09-02 (Exact confidence)
This addresses a non-routine unit-crossing condition in the approval context. The waiver request supports why the permit could be approved despite the proposed wellbore extending outside the target spacing unit.
Historical Context (2)
The State Geologist letter requires all cores, core chips, and samples to be preserved, labeled, boxed, and shipped to the state core library, with samples due within 30 days of completion of drilling operations and cores due within 180 days unless a Form 4 sundry extension is approved.
ND Mineral Resources letter dated November 16, 2026, RE: CORES AND SAMPLES · 2026-11-16
This obligation persists after permit approval and controls drilling-fluid sampling, core handling, filing, and post-completion geologic reporting. Failure creates day-by-day civil penalty exposure and can affect later operations or filings.
The permit states that any change, including shortening of the casing point, lengthening at total depth, or change in completion technique within the Bakken-Three Forks petroleum system, must have prior approval by the NDIC.
NDIC Permit Information, Page 9 of 10, Operator understandings · 2026-11-12
This condition continues beyond permit issuance and governs execution if the well reaches a different casing point, total depth, or completion method. It constrains operational decisions during drilling and completion.
Operator Pattern
Oasis/Chord paired well-specific technical proposals with regulatory waiver requests, including wet-shoe lateral completion and adjacent-spacing notification waiver, while also seeking logging waivers.
The wet-shoe description, the September 2, 2026 Order 31848 notification waiver letter, and the request or waiver language for porosity and resistivity logs in the evaluation program and permit pages.
Confidence: Medium
The approval date and key regulator conditions are explicitly dated, but OCR-imperfect text and internal conflicts—particularly between the aquifer stipulation and the operator’s no-aquifer assertion, and between the permit’s in-unit boundary language and the outside-unit notification waiver—reduce certainty about the full regulatory basis.