OTHER
Wellfile updated - +3 pages
Potter 4595 33-29 7BX
Oasis Petroleum North America LLC · Dunn County, ND · File #43481 · Generated 2026-11-27 02:13
- API
- 3302505262
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The well file contains contemporaneous permit-cycle documentation explaining the 11/12/2026 approval. The permit itself invokes Commission Order No. 35946, sets a wet-shoecorridor and north/south setback condition, and adds an aquifer special-attention inspection condition. Pre-permit September 2026 documents support those conditions by identifying off-spacing traversal and describing the wet-shoe completion method.
Permit Cycle Signals (4)
Permit Information page 2, NDIC Field Order Info
2026-11-12 (Exact confidence)
This condition directly limits the approved wellbore geometry and completion method, making it a permit-specific justification rather than routine APD language.
Permit Information page 2, SPECIAL ATTENTION
2026-11-12 (Exact confidence)
The aquifer concern is an express condition tied to approval, elevating otherwise routine closed-mud/liner requirements to a non-routine site-specific condition.
Chord Energy letter to NDIC dated September 2, 2026, RE: Potter 4595 33-29 #2BX, #3B, #4B, #5B, #6B, and #7BX
2026-09-02 (Exact confidence)
This pre-permit material addresses the off-spacing traversal and adjacent-unit approval concern relevant to the 11/12/2026 permit action.
Submitted plan, Section 1.11 Wet Shoe; Taktical plan dated 2026-09-02
2026-09-02 (Inferred confidence)
It provides the technical basis for the wet-shoe setback language in the permit and differentiates this completion geometry from routine horizontal approvals.
Historical Context (0)
No historical signals identified.
Operator Pattern
Operator seeks off-spacing or adjacent-unit notification relief when it is the operator of the adjacent spacing unit and uses lateral completion configurations that create regulatory setback constraints.
September 2, 2026 Chord Energy/Oasis letter requests notification waiver under Order No. 31848 because Oasis operates the adjacent spacing unit; permit stipulations dated November 12, 2026 tie a north setback to a production liner with a wet shoe.
Confidence: High
The permit pages carry an explicit approval date of 11/12/2026, name the operator, well, API, and file number, and state direct conditions tied to Commission Order No. 35946, wet-shoe setback, and aquifer sensitivity. Pre-permit supporting documents dated 09/02/2026 address off-spacing traversal and wet-shoe completion logic.