Wellfile updated - +5 pages
First detected 2026-11-26 · was Nov 16, 2026 · +5 pages · Full diff →

EN-Lee-157-93-2627H-1U

HESS BAKKEN INVESTMENTS II LLC · Mountrail County, ND · File #43482 · Generated 2026-11-27 02:13

API
3306105734
Target Formation
Middle Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit contains contemporaneous stipulations and field order notes that directly condition approval on Commission Order 35504 for a U-turn horizontal well crossing spacing units. It cites specific geometry, setbacks, and future submission requirements that justify the permit.

Permit Cycle Signals (3)

Approval to drill a U-turn horizontal well crossing spacing unit boundaries (Sections 26/27 and 34/35) with specific setbacks and allocation requirements pursuant to Commission Order No. 35504.
Direct
Stipulations section and NDIC Field Order Info on permit pages 2-3
2026-11-12 (Exact confidence)
Permit is explicitly conditioned on a specific commission order (35504) for a U-turn well geometry that crosses spacing unit boundaries, requiring unique setbacks and production allocation.
Requirement to submit an as-built directional survey, production liner and cementing details, and fracture stimulation procedures for prior approval due to wellbore proximity (<500 ft) to spacing unit boundary.
Direct
Stipulations section 'SPECIAL ATTENTION' on permit page 2
2026-11-12 (Exact confidence)
Directly conditions permit approval on future technical submissions and prior approvals for completion, triggered by the non-routine U-turn geometry.
East toe setback based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Direct
NDIC Field Order Info on permit page 3
2026-11-12 (Exact confidence)
Specific well construction detail (wet shoe) cited as justification for a modified setback, differentiating from standard rules.

Historical Context (2)

Production allocation to spacing units Sections 26/27 and 34/35 must be based on actual completed lateral footage within each unit as determined by the Director, per findings in case 32647.
Stipulations section on permit page 2 · Relative
Establishes a binding method for post-drilling production allocation that affects revenue distribution and reporting obligations after completion.
Operators shall not commence operations until the 3rd business day after permit publication, unless waived by the Director.
Conditions of Approval on permit page 3 · Relative
Imposes a waiting period that constrains the operator's schedule between permit approval and spud, requiring potential director engagement.
Confidence: High
The permit document explicitly references Commission Order 35504 and contains detailed, non-boilerplate stipulations directly tied to the U-turn well geometry and its approval conditions. Dates are present on the permit pages.