← Back to Daily Permits
OTHER
Wellfile updated - +3 pages
First detected 2026-11-25 · was Nov 17, 2026 · +3 pages · Full diff →

REBA 18-7-6 1H

Phoenix Operating LLC · Burke County, ND · File #43494 · Generated 2026-11-27 02:13

API
3301302094
Target Formation
Middle Bakken / Dimond-Bakken Pool
Permit Explained
Yes

Permit Cycle Assessment

The permit file contains contemporaneous regulatory documentation explaining the 11/17/2026 approval: a Special Attention stipulation about the WARD LAKE wellbore intersection, Commission Order No. 35656 setback and wet-shoe/frac-out conditions, and a spacing-unit justification/legal-coordinate condition. These materials directly explain and condition the new permit.

Permit Cycle Signals (3)

NDIC Special Attention stipulation states that the proposed REBA 18-7-6 1H crosses the existing WARD LAKE 1-5-6H-160-91 wellbore, with existing TVD approximately 8525', proposed TVD 8594' at the proposed intersection point, and separation within 69 feet.
Direct
NDIC Permit Information, Stipulations, SPECIAL ATTENTION section, page 1
2026-11-17 (Inferred confidence)
This is a non-routine wellbore-proximity condition that directly imposes drilling and frac-design precautions to avoid adversely affecting an adjacent horizontal well.
Commission Order No. 35656 approval condition requires that all portions of the well bore not isolated by cement be no closer than 150 feet from north/south boundaries and 500 feet from east/west boundaries within the 1920-acre spacing unit, and expressly ties the north setback to a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Direct
NDIC Permit Information, NDIC Field Order Info section, page 1; conditions appear through permit pages dated 11/17/2026
2026-11-17 (Inferred confidence)
The order conditions the permit on a specific casing/liner completion design and setback geometry, explaining the approved trajectory and the wet-shoe/frac-out requirement.
Permit condition states that, in order to justify the spacing unit, the well must be drilled in conjunction with a well that meets a 1220-foot setback from the east and west spacing unit boundaries, and it lists maximum legal coordinates from the well head at 7-inch casing point and at total depth.
Direct
NDIC Permit Information, page 3, conditions of approval and spacing justification
2026-11-17 (Exact confidence)
This directly ties the approval to spacing-unit justification and legal wellbore coordinates, imposing a paired-well drilling condition and coordinate limits that differentiate the permit from routine horizontal approvals.

Historical Context (2)

Hydraulic fracture stimulation notice obligation requires prior written notice, 21 to 31 days in advance, to any operator of a well completed in the same or adjacent pool when completion intervals are within 2640 feet, including 24-hour emergency contact information, planned start and end dates, and scheduling updates.
NDIC Permit Information, Operator Assertions, page 7 · 2026-11-17
This condition must be executed during future completion and fracture operations and affects coordination with adjacent Bakken/Three Forks wells, including nearby horizontal wellbores.
Any changes, shortening of casing point, lengthening at total depth, or change in completion technique within the Bakken-Three Forks Petroleum System must have prior approval by the NDIC.
NDIC Permit Information, Operator Understandings, page 9 · 2026-11-17
This creates an ongoing execution constraint: the operator cannot materially adjust the Bakken-Three Forks completion or casing depth without separate regulatory approval after this permit is issued.

Operator Pattern

Phoenix Operating appears to coordinate pad-scale Bakken/Three Forks horizontal development in advance of permit approval, using anticollision/survey documentation and pre-filing regulatory correspondence for backbuild/adjacent-spacing-unit notification.
The file names REBA 18-7-6 1H through 5H in the directional plan and backbuild letter; includes a standard planning report dated October 7, 2026 showing the existing WARD LAKE wellbore; and includes an October 8, 2026 letter to NDIC addressing NDIC Order 31848 backbuild notification for the REBA Pad.
Confidence: High
The permit approval date, operator and well identifiers, API/file number, target pool/formation, Special Attention stipulation, Commission Order condition, spacing/legal-coordinate condition, and supporting operator acknowledgments are all explicit in the extracted text. Some page-specific dates for stipulations are inferred from the permit's 11/17/2026 approval date.