← Back to Daily Permits
OTHER
Wellfile updated - +3 pages
Unknown
Unknown · Unknown County, ND · File #43496 · Generated 2026-11-27 02:13
- API
- N/A
- Target Formation
- N/A
- Permit Explained
- Partially
Permit Cycle Assessment
The anchored permit approval is partially explained by contemporaneous regulator conditions. The permit file contains an explicit proximity condition for the WARD LAKE wellbore, Commission Order No. 35656 setback conditions, and a completion-design rationale for the north setback. It does not contain a separate regulator or engineer memorandum that fully documents the approval decision.
Permit Cycle Signals (4)
NDIC Permit Information, Stipulations - SPECIAL ATTENTION (first permit page)
2026-11-17 (Exact confidence)
This is a non-routine anticollision and interference condition directly tied to the approved well trajectory and future frac execution.
NDIC Permit Information, NDIC Field Order Info (first permit page)
2026-11-17 (Exact confidence)
This is the regulator-issued order and express condition governing the anchored permit approval.
NDIC Permit Information, NDIC Field Order Info (first permit page)
2026-11-17 (Exact confidence)
This ties the setback condition to a non-routine completion design feature rather than generic drilling boilerplate.
NDIC Permit Information, construction and coordinate conditions (second and third permit pages)
2026-11-17 (Exact confidence)
These coordinates document the lateral position relative to unit boundaries and support the approved horizontal trajectory conditions.
Historical Context (2)
Backbuild Order documentation obligation for Bakken wells entering outside the target spacing unit under Order No. 318488.
Phoenix Operating backbuild order waiver letter dated October 8, 2026 · 2026-10-08
Future execution in cross-unit Bakken completions may require providing directional and completion details, formation tops, casing and cementing information, commencement dates, and contact information to adjacent spacing-unit operators.
Any change to casing point, total depth, or completion technique within the Bakken-Three Forks Petroleum System requires prior NDIC approval.
NDIC Permit Information, operator understandings (tenth permit page) · 2026-11-17
This obligation persists after permit issuance and can delay or alter drilling, liner setting, or completion decisions during well execution.
Operator Pattern
Phoenix Operating submits pre-permit regulatory correspondence to address unit-boundary and backbuild obligations, but the anchored permit does not explicitly confirm acceptance of that waiver request.
An October 8, 2026 letter from Phoenix Operating seeks a Backbuild Order Waiver for REBA wells based on no existing wells in the adjacent spacing unit; the November 17, 2026 permit information references Commission Order No. 35656 and special-attention conditions without naming that waiver letter.
Confidence: N/A