OTHER
Wellfile updated - +3 pages
First detected 2026-11-25 · was Nov 18, 2026 · +3 pages · Full diff →

Unknown

Unknown · Unknown County, ND · File #43496 · Generated 2026-11-27 02:13

API
N/A
Target Formation
N/A
Permit Explained
Partially

Permit Cycle Assessment

The anchored permit approval is partially explained by contemporaneous regulator conditions. The permit file contains an explicit proximity condition for the WARD LAKE wellbore, Commission Order No. 35656 setback conditions, and a completion-design rationale for the north setback. It does not contain a separate regulator or engineer memorandum that fully documents the approval decision.

Permit Cycle Signals (4)

Existing wellbore proximity: proposed REBA well crosses the WARD LAKE 1-5-6H-160-91 wellbore within 89 feet, with proposed TVD 8594 feet versus existing TVD approximately 8505 feet; precautions are required during drilling and frac design to avoid adverse effects on the existing well.
Direct
NDIC Permit Information, Stipulations - SPECIAL ATTENTION (first permit page)
2026-11-17 (Exact confidence)
This is a non-routine anticollision and interference condition directly tied to the approved well trajectory and future frac execution.
Commission Order No. 35656 conditions approval on setbacks: wellbore portions not isolated by cement must be no closer than 150 feet from north/south boundaries and 1220 feet from east/west boundaries within the 1920-acre spacing unit.
Direct
NDIC Permit Information, NDIC Field Order Info (first permit page)
2026-11-17 (Exact confidence)
This is the regulator-issued order and express condition governing the anchored permit approval.
North setback rationale: the north setback is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Direct
NDIC Permit Information, NDIC Field Order Info (first permit page)
2026-11-17 (Exact confidence)
This ties the setback condition to a non-routine completion design feature rather than generic drilling boilerplate.
Approved legal coordinates and directional limits: maximum 405 feet south and minimum 162 feet west from the wellhead at 7-inch casing point; maximum legal coordinate from the wellhead at total depth is 15169 feet north.
Direct
NDIC Permit Information, construction and coordinate conditions (second and third permit pages)
2026-11-17 (Exact confidence)
These coordinates document the lateral position relative to unit boundaries and support the approved horizontal trajectory conditions.

Historical Context (2)

Backbuild Order documentation obligation for Bakken wells entering outside the target spacing unit under Order No. 318488.
Phoenix Operating backbuild order waiver letter dated October 8, 2026 · 2026-10-08
Future execution in cross-unit Bakken completions may require providing directional and completion details, formation tops, casing and cementing information, commencement dates, and contact information to adjacent spacing-unit operators.
Any change to casing point, total depth, or completion technique within the Bakken-Three Forks Petroleum System requires prior NDIC approval.
NDIC Permit Information, operator understandings (tenth permit page) · 2026-11-17
This obligation persists after permit issuance and can delay or alter drilling, liner setting, or completion decisions during well execution.

Operator Pattern

Phoenix Operating submits pre-permit regulatory correspondence to address unit-boundary and backbuild obligations, but the anchored permit does not explicitly confirm acceptance of that waiver request.
An October 8, 2026 letter from Phoenix Operating seeks a Backbuild Order Waiver for REBA wells based on no existing wells in the adjacent spacing unit; the November 17, 2026 permit information references Commission Order No. 35656 and special-attention conditions without naming that waiver letter.
Confidence: N/A