← Back to Daily Permits
OTHER
Wellfile updated - +3 pages
First detected 2026-11-25 · was Nov 18, 2026 · +3 pages · Full diff →

REBA 18-7-6 4H

Phoenix Operating LLC · Burke County, ND · File #43497 · Generated 2026-11-27 02:13

API
3301302097
Target Formation
Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit file contains contemporaneous documentation explaining the 11/17/2026 approval. The approval is conditioned by Commission Order No. 35656, which sets spacing-boundary setbacks and ties the north setback to a wet-shoe frac-out completion design. The permit also contains a direct special-attention stipulation for a close crossing of the WARD LAKE 1-5-6H-160-91 wellbore, which justifies drilling and frac precautions. A dated pre-permit directional and casing plan supports the regulatory setback condition.

Permit Cycle Signals (3)

NDIC special-attention stipulation: proposed well crosses the existing WARD LAKE 1-5-6H-160-91 wellbore; proposed intersection TVD is 8594 ft, existing TVD is approximately 8500 ft, and the proposed wellbore is within 94 ft of the existing wellbore; drilling and frac design must avoid adverse effect on the existing well.
Direct
Page 1, Permit Information, Stipulations, SPECIAL ATTENTION; permit page date 11/17/2026
2026-11-17 (Exact confidence)
This is a non-routine close-proximity wellbore crossing that imposes anti-collision and frac-design constraints directly on the approved operation.
Pursuant to Commission Order No. 35656, approval is granted on the condition that wellbore portions not isolated by cement remain no closer than 150 ft from the north and south boundaries and 500 ft from the east and west boundaries within the 1920-acre spacing unit; the north setback is based on a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe.
Direct
Page 1, NDIC Field Order Info, Commission Order No. 35656; permit page date 11/17/2026
2026-11-17 (Inferred confidence)
This directly ties the permit approval to spacing-unit setbacks and a specific completion design required to satisfy the condition.
Pre-permit proposed drilling plan and directional design show a 4-1/2 in production liner from 8086 ft to 24502 ft MD, including a wet shoe and frac-out toe capability, supporting the permit’s wet-shoe/frac-out setback condition and the planned trajectory through the Bakken.
Supporting
Proposed Drilling Plan; COMPASS Plan/Proposal 1 report dated 10/7/2026
2026-10-07 (Exact confidence)
The technical submission demonstrates the completion geometry and frac-out capability relied upon in the permit condition.

Historical Context (1)

Phoenix Operating submitted a Backbuild Order Waiver letter for the REBA 1H through 5H pad wells, stating the wells are proposed to enter the Bakken Petroleum System outside the target spacing unit and citing NDIC Order 31848 notification requirements, while asserting there are no existing wells in the adjacent spacing unit.
Backbuild Order Waiver letter dated October 8, 2026 · 2026-10-08
It indicates a multi-well pad and off-spacing development pattern that may continue to trigger spacing, backbuild, or adjacent-operator notification obligations for other wells on the REBA pad.

Operator Pattern

Phoenix Operating is developing a multi-well REBA pad with horizontally drilled Bakken wells and has used a backbuild/off-spacing waiver submission to address spacing-unit concerns.
The directional design references REBA 1H, 2H, 3H, 4H, 5H, and REBA 1 SWD; the October 8, 2026 waiver letter discusses the REBA 1H-5H pad and NDIC Order 31848.
Confidence: High
The permit date, approval date, stipulations, Commission Order reference, and dated directional plan are explicit and legible. The key permit-cycle conditions are contemporaneous and directly tied to the anchored approval.