← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
MACHETE 14-23-26-35 2H
Phoenix Operating LLC · McKenzie County, ND · File #43499 · Generated 2026-11-27 02:13
- API
- 3305310933
- Target Formation
- Ranch Creek-Bakken Pool / Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The 2026-11-18 permit action is explained by contemporaneous stipulations tied directly to approval. The permit is conditioned on Commission Order No. 35176, specific setback limits within the 2560-acre spacing unit, a production-liner wet shoe and frac-out geometry, lateral legal-coordinate limits, and required contact with the NDIC field inspector before construction.
Permit Cycle Signals (4)
Permit Information, STIPULATIONS, NDIC Field Order Info, Page 1, dated 2026-11-18
2026-11-18 (Exact confidence)
This directly conditions the permit on specific lateral setbacks tied to the spacing unit, rather than presenting a generic horizontal-drilling setback condition.
Permit Information, STIPULATIONS, NDIC Field Order Info, Page 1, dated 2026-11-18
2026-11-18 (Exact confidence)
The approval condition is explicitly tied to a completion-geometry method, wet shoe and frac-out capability, which differentiates this permit from routine lateral approval language.
Permit Information, Page 2, dated 2026-11-18
2026-11-18 (Exact confidence)
These restrictions condition approval on the specific wellbore track and legal coordinate limits for the proposed lateral path.
Permit Information, STIPULATIONS, Construction Commencement Notification, Page 1, dated 2026-11-18
2026-11-18 (Exact confidence)
This is a direct operator-specific pre-construction condition attached to the permit action.
Historical Context (4)
Operators may not commence operations on the drill site until the third business day following publication of the approved drilling permit on the NDIC Daily Activity Report, unless waived by the Director.
Permit Information, Page 2, dated 2026-11-18 · 2026-11-18
This continues to constrain field mobilization and start-up timing after permit issuance.
The operator must immediately notify the NDIC Field Inspector or Bismarck office upon spudding and file a Sundry Notice in NorthSTAR within 3 business days of spudding with well name, legal location, file number, drilling contractor and rig number, company representative, date, and time of spudding.
Permit Information, Page 2, dated 2026-11-18 · 2026-11-18
This creates a forward filing and notification obligation tied directly to the drilling event.
The operator understands that any changes, shortening of casing point or lengthening at Total Depth, or change in completion technique within the Bakken-Three Forks Petroleum System must have prior approval by the NDIC.
Operator Understandings, Page 9, dated 2026-11-18 · 2026-11-18
This restricts future execution, redesign, or completion changes during drilling and completion without regulatory approval.
The operator is bound by hydraulic fracture stimulation notice requirements to any operator of a well completed in the same or adjacent pool where completion intervals are within 2640 feet of one another, with prior written notice up to 31 days and not less than 21 days before fracture stimulation.
Operator Assertions, Page 7, dated 2026-11-18 · 2026-11-18
This affects future completion scheduling, offset-operator coordination, and stimulation planning.
Operator Pattern
Phoenix Operating LLC appears to develop multi-well pads in the Ranch Creek Bakken from an off-spacing surface location, with pad-level surface agreements and regulatory coordination for several wells.
The file includes an affidavit dated 2026-11-18 covering MACHETE 14-23-26-35 1H, 2H, 3H, and 4H as off-spacing wells from the MORRIS-MACHETE Pad in SE Quarter SE Quarter of Section 11, T146N, R99W, and a June 9, 2026 letter addressing NDIC Order 31973 backbuild notification for the same pad.
Confidence: High
The permit approval date, operator, file number, API, well name, county, spacing unit, and contemporaneous stipulations are explicitly present. The permit-cycle analysis relies primarily on documents dated with the approval date, while attached surveys and letters are treated as contextual or historical where not explicitly tied to the permit condition.