OTHER
Wellfile updated - +1 pages
First detected 2026-11-25 · was Nov 18, 2026 · +1 page · Full diff →

MACHETE 14-23-26-35 3H

Phoenix Operating LLC · McKenzie County, ND · File #43500 · Generated 2026-11-27 02:13

API
3305310934
Target Formation
Bakken
Permit Explained
Yes

Permit Cycle Assessment

The permit approval is directly explained by contemporaneous documents. A regulatory stipulation tied to Commission Order 35176 conditions approval on specific setbacks justified by the cemented liner/wet shoe design. An affidavit confirms a surface use agreement for off-spacing drilling, and a waiver request letter addresses Backbuild Order notification requirements.

Permit Cycle Signals (3)

Permit approval is granted pursuant to Commission Order No. 35176, with the condition that portions of the well bore not isolated by cement maintain a 150' setback from north/south boundaries and a 500' setback from east/west boundaries within the 2560-acre spacing unit. The south setback is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
Direct
Permit Information - STIPULATIONS section, first stipulation item
Approval date references Order 35176 (date of order not in document) (Missing confidence)
This stipulation directly conditions permit approval on specific setbacks justified by the proposed well geometry (cemented liner with wet shoe) and completion design. It is a non-routine, geometry-specific condition tied to the permit.
Affidavit of Surface Damage Agreement stating the operator has obtained a surface use agreement with the landowner for drilling multiple wells off-spacing unit, specifically covering the MACHETE 14-23-26-35 3H.
Direct
AFFIDAVIT OF SURFACE DAMAGE AGREEMENT, near end of document
2026-11-18 (Exact confidence)
The affidavit is a pre-permit submission required for approval because the well is drilled off-spacing from a surface location outside its target unit. It is a direct regulatory prerequisite for permit issuance.
Waiver request letter for Backbuild Order requirements (Order 31973) because Phoenix Energy is the offset operator in the adjacent spacing unit the wellbore traverses, making additional notification unnecessary.
Supporting
Letter dated June 9th, 2026, from Meaghan Coughlan, Senior Regulatory Specialist, to Todd Holweger
2026-06-09 (Exact confidence)
This letter is a specific waiver request and justification submitted prior to permit approval to address a regulatory order (31973) concerning wells entering the Bakken system outside their target spacing unit. It directly supports permit approval by resolving a notification requirement.

Historical Context (2)

The well is part of a multi-well pad (MORRIS-MACHETE 11 Pad) with multiple existing and proposed wellbores (MORRIS wells 1H-4H and SWD, MACHETE wells 1H-4H and SWD) in close proximity, as shown on the multi-well plan and layout diagrams.
Multi-well plan diagrams, TYPICAL RIG LAYOUT, WELL PROXIMITY MAP · 2026-05-06 (plat revision date)
Close wellbore spacing creates a persistent anti-collision risk that must be managed during drilling execution for this well and future wells on the pad. It imposes an ongoing operational constraint for directional drilling.
The Approved Directional Points show the well will be drilled from a surface location in Section 11 to a bottom hole location in Section 35, traversing multiple sections and spacing units.
APPROVED DIRECTIONAL POINTS table and well location plat · Permit date 2026-11-18
The long-reach, cross-unit trajectory is a fixed design element that imposes persistent directional drilling challenges, anti-collision monitoring needs, and potential regulatory interactions if deviations occur.

Operator Pattern

Operator utilizes pad drilling with multiple long-reach lateral wells targeting the Bakken from a single surface location, often outside the target spacing unit.
Documentation shows a multi-well pad design with at least 8 proposed wellbores. The Affidavit and waiver letter confirm a pattern of drilling wells off-spacing from a common pad, requiring surface agreements and regulatory waivers.
Confidence: High
The document contains explicit, date-stamped regulatory correspondence (waiver letter, affidavit) and permit stipulations that directly reference the conditions for approval. Key dates and roles are clearly identified. The separation between permit-cycle and historical signals is clear based on temporal proximity to the approval date and forward-operational impact.