OTHER
Wellfile updated - +1 pages
AMBER 2104-7BH
KODA Resources Operating, LLC · Divide County, ND · File #43502 · Generated 2026-11-27 02:13
- API
- 3302301928
- Target Formation
- Middle Bakken / Fertile Valley-Bakken Pool
- Permit Explained
- Yes
Permit Cycle Assessment
The permit file contains contemporaneous documentation explaining the November 19, 2026 approval. The approval is conditioned by Commission Order No. 35707 setback requirements, aquifer-specific protection stipulations, and legal-coordinate restrictions on the lateral. Operator filings also support the off-spacing surface-use requirement, although the adjacent-spacing waiver request lacks visible disposition.
Permit Cycle Signals (5)
Permit page 2, NDIC Field Order Info
2026-11-19 (Exact confidence)
This is the central regulator-issued order conditioning permit approval on spacing-unit legality and completion design.
Permit page 1, Stipulations - SPECIAL ATTENTION
2026-11-19 (Exact confidence)
The aquifer location drives non-routine environmental and containment requirements that condition the approval.
Permit page 3, Conditions of Approval
2026-11-19 (Exact confidence)
This explains why the proposed directional path is acceptable under the rectangular-coordinate legality method and spacing-unit constraints.
Permit page 8, Operator Assertions; Affidavit of Surface Use Agreement dated November 3, 2026
2026-11-03 (Exact confidence)
The permit requires an affidavit when the well is off-spacing; this submission supports approval.
Letter dated November 3, 2026 to NDIC Todd Holweger
2026-11-03 (Exact confidence)
This explains a pre-approval regulatory concern associated with crossing an adjacent spacing unit, but the file does not show the waiver disposition.
Historical Context (4)
The production liner must remain cemented with a wet shoe and the shoe must be capable of frac-out.
Permit page 2, NDIC Field Order Info; Drilling Plan completion notes · 2026-11-19
This completion design affects future cementing, frac-out, and mechanical isolation work and is tied to the permit’s setback and spacing legality constraints.
Operations cannot begin before the third business day following publication of the approved permit unless the Director waives the waiting period; KODA filed a waiver affidavit for the multi-well Amber 21 pad.
Permit page 2, Construction Commencement Notification; Affidavit request dated November 3, 2026 · 2026-11-19
The start date remains constrained by the waiting-period rule and any waiver action, affecting future mobilization and pad sequencing.
Any shortening of casing point, lengthening of total depth, or change in completion technique within the Bakken-Three Forks Petroleum System requires prior NDIC approval.
Permit page 10, Operator understandings · 2026-11-19
This creates an ongoing regulatory gate for execution changes after permit issuance.
Construction or location activity requires prior contact with NDIC Field Inspector Marc Binns, and additional site-specific stipulations may be added at the inspector’s discretion.
Permit page 1, Special Attention; Permit page 2, Construction Commencement Notification · 2026-11-19
Because the well is on an aquifer, field inspector conditions can still be imposed after approval, affecting future site execution.
Operator Pattern
KODA is repeatedly using pre-approval and post-approval waiver mechanisms tied to an existing multi-well pad, including off-spacing surface-use documentation, adjacent-spacing-unit documentation waiver, and three-day waiting-period relief.
Off-spacing operator assertion, surface-use affidavit, KODA letter requesting waiver from NDIC Order No. 31973, and KODA affidavit requesting waiver of the three-day waiting period.
Confidence: Medium
The permit approval date and key stipulations are clear, but OCR artifacts and missing waiver dispositions reduce certainty about whether all permit-cycle concerns are fully resolved.