← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
Cottonwood 104-0522H
EOG RESOURCES, INC. · Mountrail County, ND · File #43506 · Generated 2026-11-27 02:13
- API
- 3306105735
- Target Formation
- Three Forks
- Permit Explained
- Yes
Permit Cycle Assessment
The permit contains direct stipulations conditioning approval on unit-specific setbacks justified by a non-routine downhole completion plan (wet shoe). Contemporaneous supporting documentation includes the operator's drilling plan detailing the 'frac out the toe' request and a required diesel fuel affidavit.
Permit Cycle Signals (4)
Permit Information - STIPULATIONS section
2026-11-20 (Exact confidence)
Permit stipulation directly ties approval to specific unit-based geometry and a non-routine downhole condition (wet shoe) requiring a specific completion approach.
Drilling Plan - 4 1/2" Production Liner & Cementing Notes
Unknown (Missing confidence)
Technical submission directly supports and justifies the regulator's condition regarding the north setback and the wet shoe completion method referenced in the permit approval.
Page 2 - Construction Commencement Notification
2026-11-20 (Exact confidence)
Specific, non-boilerplate pre-construction contact requirement tied directly to permit approval.
Affidavit in Re Hydraulic Fracture Fluids
2026-09-28 (Exact confidence)
Pre-permit regulatory submission required for approval, addressing specific EPA-defined constituents.
Historical Context (2)
The well is subject to Commission Orders No. 35122 & 35123, which define the Alger-Bakken Unit and its unitized formation.
Permit Information - STIPULATIONS section and Completion Intervals · Unknown
These orders establish the legal and geologic framework (pool definition, unit boundaries) for all operations within the unit, governing spacing, target formation, and regulatory jurisdiction beyond this specific permit.
Mission Canyon Formation is identified as a known H2S zone in the basin, with an attached H2S plan referenced.
Drilling Plan - ABNORMAL CONDITIONS section · Unknown
Imposes persistent safety and procedural obligations (plan implementation, monitoring, reporting) during drilling and any future workovers that penetrate this zone.
Operator Pattern
Operator utilizes standardized planning, certification, and affidavit processes for multi-well pads and regulatory compliance.
Single affidavit covering four wells on the Ross 5 NWNE pad; use of certified survey plats and professional engineering drawings; standardized assertions in APD.
Confidence: High
The permit document contains explicit stipulations with direct justifications. Supporting technical submissions (drilling plan, affidavit) are included in the file and are clearly linked to the permit conditions. Key dates (permit approval, affidavit, submission) are present.