← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
Cottonwood 18-0522H
EOG RESOURCES, INC. · Mountrail County, ND · File #43507 · Generated 2026-11-27 02:13
- API
- 3306105736
- Target Formation
- Middle Bakken
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval is directly explained by its conditionality on prior unitization orders (35122, 35123) and by specific regulatory stipulations regarding unit boundary setbacks justified by a planned cemented liner with a wet shoe. Supporting affidavits and pre-construction notifications further condition the approval.
Permit Cycle Signals (4)
Permit Information - STIPULATIONS
2026-11-20 (Exact confidence)
Direct regulatory stipulation modifying standard setbacks based on specific well geometry (cemented liner with wet shoe).
Permit Information - STIPULATIONS
Relative (Missing confidence)
Permit action is legally bound to prior unitization orders establishing the drilling unit and target formation.
Page 2 - Conditions of Approval
Unknown (Missing confidence)
Specific, non-routine pre-construction notification requirement tied to this permit.
Affidavit in Re Hydraulic Fracture Fluids
2026-09-28 (Exact confidence)
Regulatory prerequisite submission (supporting affidavit) conditioning permit approval for pad.
Historical Context (2)
The Alger-Bakken Unit is defined by Orders 35122 & 35123, establishing the unitized formation from 50' above the Bakken to above the Birdbear Formation, as identified in a specific log from the Erie #44-19H well.
Permit Information - STIPULATIONS · Relative
This unit definition legally constrains all future drilling, completion, and production within the unit area for this and other unit wells.
Mission Canyon Formation is identified as an anticipated H2S zone.
Drilling Plan Page 3 - Section 1 Geological Formations & ABNORMAL CONDITIONS · Unknown
Imposes persistent safety and materials selection requirements during drilling through this zone for this and potentially future wells in the area.
Operator Pattern
Operator utilizes standardized APD packages with integrated drilling plans, anti-collision reviews, and regulatory affidavits (e.g., no-diesel frac).
Comprehensive APD includes integrated directional plan, H2S plan reference, cementing programs, and pad-wide affidavit for hydraulic fracture fluids.
Confidence: High
The permit document contains explicit, contemporaneous regulatory stipulations that directly condition and explain the approval. Key dates (approval, submission, affidavit) are present. The separation between permit-cycle and historical context is clear within the document.